Transformer-to-Fixture Connection

AGL Secondary Lead for Airfield Lighting

Flexible connection between isolating transformer and fixture

Transformer Secondary SideMatched to Fixture & ConnectorInset & Elevated Fixtures

Secondary leads for connecting AGL isolating transformers to airfield light fixtures, selected for transformer, fixture and connector compatibility.

Supplied by Precision AGL Solutions

AGL Secondary Lead

What It Is

AGL Secondary Leads provide the flexible electrical connection between an airfield lighting isolating transformer and the associated light fixture.

The lead carries power from the secondary side of the transformer to the individual AGL fixture, so it must be selected according to the transformer interface, fixture requirements, connector arrangement, cable construction and installation environment.

What We Supply

Precision AGL Solutions supplies secondary lead configurations for runway, taxiway, approach and other compatible series-circuit airfield lighting applications.

The lead provides the flexible connection required where the transformer and fixture are installed separately, for example within a transformer pit or light base. Select it as a complete connection system rather than by lead length alone.

Primary CableSeries circuit
Isolating TransformerL-830
Secondary LeadFlexible connection
Secondary ConnectorFixture interface
AGL FixtureLight fixture

Where Secondary Leads Are Used

Runway lightsEdge, threshold, end, centreline and touchdown zone lights.
Taxiway lightsTaxiway edge and centreline lights.
Stop bar & runway guardStop bar and runway guard lights.
Approach lightingApproach lighting fixtures.
Inset lightsInset runway and taxiway lights.
Elevated fixturesElevated airfield lighting fixtures.

Also Used For

  • New AGL installations
  • Airfield lighting rehabilitation
  • Fixture replacement
  • Isolating transformer replacement
  • Maintenance activities
  • Spare-parts requirements

Compatibility

Secondary leads can be used with suitable airfield lighting fixtures. Confirm compatibility with the specific transformer, fixture and connector before ordering.

Function of the Secondary Lead

The Lead Must Provide

  • Suitable electrical insulation
  • Appropriate conductor construction
  • Required flexibility
  • Mechanical durability
  • Environmental resistance
  • Compatibility with the transformer
  • Compatibility with the fixture
  • Compatibility with the selected connectors

Transfer of Power

The secondary lead transfers power from the isolating transformer’s secondary output to the individual airfield light.

Install it without excessive mechanical stress or sharp bending.

Transformer and Fixture Compatibility

Transformer Compatibility

The lead must match the secondary interface of the selected transformer. Confirm:

  • Transformer manufacturer
  • Transformer model
  • Transformer rating
  • Secondary connection arrangement
  • Secondary lead termination
  • Required connector type
  • Cable/lead dimensions

Do not select a lead solely on physical length. Verify the transformer interface and electrical characteristics.

Fixture Compatibility

The opposite end must be compatible with the airfield light fixture. Compatibility may depend on:

  • Fixture manufacturer
  • Fixture model
  • Fixture wattage
  • Fixture lead arrangement
  • Connector configuration
  • Termination method
  • Required electrical characteristics
  • Physical connection dimensions

For replacement projects, identify the existing fixture and connector before selecting the replacement lead.

Conductor Configuration, Insulation and Flexibility

Conductor Configuration

  • Number of conductors
  • Conductor material
  • Conductor size
  • Conductor construction
  • Insulation system
  • Overall cable diameter
  • Flexibility
  • Temperature rating

Match the electrical requirements of the fixture and transformer.

Insulation

Provides electrical separation between the conductors and the surrounding environment.

  • Insulation material
  • Dielectric strength
  • Insulation resistance
  • Temperature capability
  • Moisture resistance
  • Environmental durability
  • Compatibility with connector components

Flexibility

The lead should permit:

  • Controlled bending
  • Fixture removal
  • Transformer access
  • Connector installation
  • Maintenance movement

Flexibility should not come at the expense of required insulation or environmental performance.

Select According to the Physical Arrangement

Required Length May Depend On

  • Transformer location
  • Fixture location
  • Light base configuration
  • Transformer pit dimensions
  • Added secondary load (a long lead adds resistance and must stay within the transformer rating)
  • Cable routing
  • Connector position
  • Required maintenance flexibility

The lead should be long enough to permit proper installation and maintenance without creating excessive loose cable within the installation.

Coordinate With the Secondary Connector Kit

Isolating Transformer → Secondary Lead → Secondary Connector → Fixture

Confirm Compatibility For

  • Lead diameter
  • Conductor size
  • Insulation construction
  • Connector termination
  • Sealing system
  • Fixture interface
  • Transformer interface

Where connectors are supplied separately, follow the connector manufacturer’s approved cable/lead compatibility information. See Secondary Connector Kit.

Inset, Elevated and Transformer Pit Installations

Inset Lights

The lead may be routed through the light base or associated installation arrangement. Consider:

  • Limited installation space
  • Cable bend radius
  • Fixture removal
  • Moisture exposure
  • Connector accessibility
  • Mechanical protection
  • Lead routing

Do not pinch the lead or subject it to excessive stress during fixture installation.

Elevated Lights

The lead may connect the transformer to a fixture on a base, stake or mounting assembly. Allow sufficient movement for maintenance while avoiding:

  • Excessive slack
  • Cable tension
  • Sharp bends
  • Abrasion
  • Mechanical interference

Transformer Pit

Route the lead to allow:

  • Transformer access
  • Fixture connection
  • Inspection
  • Maintenance
  • Drainage
  • Appropriate cable separation
  • Protection from mechanical damage

The lead should not obstruct the pit cover or other maintenance access components.

AGL Secondary Lead Specification

ParameterSpecification
Product TypeAGL Secondary Lead
ApplicationTransformer-to-fixture connection
Conductor ConfigurationModel/project-specific
Conductor SizeConfiguration-specific
Conductor MaterialModel-specific
InsulationModel-specific
Lead LengthProject-specific
Overall DiameterModel-specific
TerminationConfiguration-specific
Connector TypeAccording to application
Transformer CompatibilityModel-specific
Fixture CompatibilityModel-specific
Minimum Bending RadiusManufacturer specified
Rated Voltage / CurrentModel-specific: must suit the transformer secondary output and the fixture lamp current
Temperature RatingModel-specific
Environmental PerformanceApplication-specific
WeightLength/configuration dependent

Six Steps to Accurate Selection

1. Identify the Isolating Transformer

  • Manufacturer
  • Model
  • Transformer rating
  • Secondary interface
  • Existing lead details, if applicable

2. Identify the Light Fixture

  • Manufacturer
  • Model
  • Fixture type
  • Wattage
  • Existing connector arrangement

3. Confirm Cable Requirements

  • Conductor size
  • Conductor configuration
  • Insulation
  • Overall diameter
  • Required flexibility
  • Temperature requirements

4. Determine Required Length

  • Measure the route between transformer and fixture
  • Allow for proper routing
  • Allow for connector installation
  • Allow for maintenance
  • Allow for fixture removal
  • Allow for transformer access

5. Confirm Connector Requirements

  • Selected secondary connector
  • Transformer interface
  • Fixture connection

6. Confirm Installation Environment

  • Transformer pit
  • Light base
  • Inset fixture installation
  • Elevated fixture installation
  • Underground or protected arrangement

Specify Together, Identify Before Replacing

New Installation

Specify the secondary lead together with the:

  • AGL light fixture
  • Isolating transformer
  • Secondary connector
  • Light base
  • Primary connector
  • Primary cable
  • CCR

This helps ensure compatibility throughout the complete AGL electrical chain.

Replacement Applications

Provide the existing component information wherever possible:

  • Existing transformer nameplate
  • Existing fixture nameplate
  • Existing secondary lead
  • Connector photographs
  • Lead dimensions
  • Existing cable markings
  • Installation photographs

If the transformer or fixture has been replaced with a different model, review compatibility before reusing the existing lead.

Installation Procedure

  1. Confirm transformer and fixture compatibility
  2. Verify lead type and length
  3. Inspect the lead for damage
  4. Route the lead without excessive bending
  5. Maintain the specified minimum bending radius
  6. Connect the transformer end
  7. Connect the fixture end
  8. Install and secure the secondary connector where applicable
  9. Check mechanical security
  10. Verify cable routing and protection
  11. Perform required electrical testing

Follow the approved product manufacturer’s instructions. Complete connector assembly according to the approved connector installation procedure.

Routing and Environmental Performance

Cable Routing — Avoid

  • Sharp bends
  • Excessive tension
  • Pinching
  • Abrasion
  • Contact with sharp edges
  • Unnecessary loops
  • Mechanical interference with fixture components

Allow freedom of movement for maintenance, but keep the lead controlled within the installation.

Environmental Exposure

  • Moisture
  • Temperature variation
  • Water accumulation
  • Soil or contaminants
  • Mechanical movement
  • UV exposure in some installations
  • Maintenance activity

The selected lead construction should suit its actual installation environment.

Check as Part of AGL Commissioning

Checks May Include

  • Visual inspection
  • Lead identification
  • Connector inspection
  • Mechanical security
  • Insulation condition
  • Continuity testing where applicable
  • Insulation resistance testing where specified
  • Fixture operation
  • Series-circuit verification

Testing requirements should follow the approved project procedure.

Inspect Whenever the Fixture or Transformer Is Serviced

Check For

  • Damaged insulation
  • Cuts or abrasion
  • Excessive bending
  • Loose termination
  • Connector damage
  • Moisture ingress
  • Mechanical stress
  • Heat damage
  • Deterioration of the lead

Evaluate any damaged lead before the circuit is returned to normal operation.

Symptoms and Possible Causes

Fixture Not Operating

  • Damaged secondary lead
  • Open conductor
  • Loose termination
  • Failed secondary connector
  • Transformer secondary fault
  • Fixture fault
  • Primary series-circuit fault

Intermittent Operation

  • Loose connection
  • Damaged conductor
  • Cable movement
  • Connector problem
  • Moisture ingress
  • Mechanical stress
  • Fixture connection

Repeated Lead Failure

  • Incorrect lead specification
  • Excessive mechanical stress
  • Incorrect routing
  • Excessive bending
  • Inadequate environmental protection
  • Incorrect connector installation
  • Fixture movement

Investigate as a complete transformer-to-fixture connection.

For Accurate Secondary Lead Selection, Provide

Information Required

  • Transformer manufacturer and model
  • Transformer rating
  • Fixture manufacturer and model
  • Fixture wattage
  • Existing lead type
  • Conductor size
  • Lead diameter
  • Required length
  • Connector type
  • Installation arrangement
  • Quantity
  • Airport/project specification

Photographs of the existing transformer connection, fixture connection and secondary lead can assist with compatibility identification.

Electrical Safety — Isolation and Lock-Out

WARNING — never open a live series circuit. An open series circuit driven by a constant-current regulator can produce dangerously high voltage. Opening, cutting or disconnecting any part of an energised circuit can cause serious injury or death and damage equipment.

  • De-energise the circuit at the regulator and apply the site lock-out / tag-out (LOTO) procedure before any work
  • Where the circuit must be isolated or shorted, use the series circuit cut-out switch or approved isolation device — not an improvised bypass
  • Do not disconnect the secondary lead with the circuit energised: an open secondary can still present hazardous voltage and damage the transformer
  • Verify the circuit is de-energised and the output is isolated before touching conductors, connectors, splices or transformers
  • Work only under the airport's permit-to-work system, using qualified personnel and the manufacturer's instructions
  • Follow the applicable national electrical safety regulations and site procedures

Review Against the Project Specification

Review Against the Applicable

  • Airport authority specification
  • AGL equipment requirements
  • Project technical specification
  • Manufacturer installation requirements
  • FAA AC 150/5345-7F (L-824 cable), AC 150/5345-26E (L-823 connectors) and AC 150/5345-47C (isolation transformers) – verify current editions
  • ICAO Annex 14 Vol. I Chapter 8 and Doc 9157 Part 5 (Electrical Systems)

Verify the exact requirements for the specific airport project before procurement and installation.

Technical Documentation

Depending on the Selected Configuration

  • Product datasheet
  • Cable construction information
  • Dimensional information
  • Connector compatibility information
  • Installation instructions
  • Testing requirements
  • Compliance documentation

Project-specific technical submittals can be prepared where required.

AGL Secondary Lead — Frequently Asked Questions

What is an AGL secondary lead?

An AGL secondary lead is the flexible electrical connection between an airfield lighting isolating transformer and the associated light fixture. It carries power from the secondary side of the transformer to the individual fixture, so it must be selected according to the transformer interface, fixture requirements, connector arrangement, cable construction and installation environment. It is used where the transformer and fixture are installed separately, for example within a transformer pit or light base.

Where are secondary leads used?

They are used with runway edge, threshold, end, centreline and touchdown zone lights, taxiway edge and centreline lights, stop bar and runway guard lights, approach lighting fixtures, and inset and elevated fixtures. They are also used for new installations, rehabilitation, fixture and isolating transformer replacement, maintenance and spare-parts requirements.

How do I select the right secondary lead?

Select it as a complete connection system rather than by lead length alone. Identify the isolating transformer (manufacturer, model, rating, secondary interface and existing lead details), the light fixture (manufacturer, model, type, wattage and existing connector arrangement), the cable requirements, the required length, the connector requirements and the installation environment.

What must a secondary lead be compatible with?

One end must match the secondary interface of the selected transformer, and the opposite end must be compatible with the fixture, which can depend on the fixture manufacturer, model, wattage, lead arrangement, connector configuration, termination method and physical connection dimensions. It must also be compatible with the selected connectors, including lead diameter, conductor size, insulation construction, termination and sealing system. For replacement projects, identify the existing fixture and connector before selecting the replacement lead.

How long should a secondary lead be?

The required length can depend on the transformer and fixture locations, light base configuration, transformer pit dimensions, cable routing, connector position and the required maintenance flexibility. It also depends on the added secondary load, because a long lead adds resistance and must stay within the transformer rating. The lead should be long enough to allow proper installation and maintenance without creating excessive loose cable.

What are the main construction requirements?

The lead should provide suitable electrical insulation, an appropriate conductor construction, the required flexibility, mechanical durability, environmental resistance, and compatibility with the transformer, fixture and connectors. Conductor configuration, size, material, insulation, overall diameter and temperature rating should match the electrical requirements of the fixture and transformer, and flexibility should not come at the expense of required insulation or environmental performance.

What are the rated voltage and current of a secondary lead?

They are model-specific, and the lead must suit the transformer secondary output and the fixture lamp current. Confirm the exact conductor, insulation, temperature rating, minimum bending radius and other values against the manufacturer’s documentation for the selected configuration.

How should a secondary lead be routed and installed?

Route it without excessive bending, maintain the specified minimum bending radius, and avoid sharp bends, excessive tension, pinching, abrasion, contact with sharp edges, unnecessary loops and mechanical interference with fixture components. In inset lights, consider limited space, fixture removal and moisture exposure. In a transformer pit, route it to allow transformer access, fixture connection, inspection, maintenance and drainage, without obstructing the pit cover. Allow freedom of movement for maintenance while keeping the lead controlled.

What information is needed when replacing a secondary lead?

Provide the existing transformer and fixture nameplate details, the existing secondary lead, connector photographs, lead dimensions, existing cable markings and installation photographs. If the transformer or fixture has been replaced with a different model, review compatibility before reusing the existing lead.

How is a secondary lead inspected and tested?

Checks may include visual inspection, lead identification, connector inspection, mechanical security, insulation condition, continuity testing where applicable, insulation resistance testing where specified, fixture operation and series-circuit verification, following the approved project procedure. During maintenance, look for damaged insulation, cuts or abrasion, excessive bending, loose terminations, connector damage, moisture ingress, mechanical stress and heat damage.

Why does a fixture not operate, or a lead keep failing?

A fixture that is not operating can come from a damaged secondary lead, an open conductor, a loose termination, a failed secondary connector, a transformer secondary fault, a fixture fault or a primary series-circuit fault. Intermittent operation can come from a loose connection, damaged conductor, cable movement, moisture ingress or mechanical stress. Repeated lead failure can come from an incorrect lead specification, excessive stress, incorrect routing, excessive bending, inadequate environmental protection or incorrect connector installation. Investigate it as a complete transformer-to-fixture connection.

Is it safe to disconnect a secondary lead while the series circuit is energised?

No. An open series circuit driven by a constant-current regulator can produce dangerously high voltage, and an open secondary can still present hazardous voltage and damage the transformer. De-energise the circuit at the regulator, apply the site lock-out / tag-out procedure, verify the circuit is de-energised and the output isolated before touching conductors, connectors, splices or transformers, and work under the airport’s permit-to-work system. See the electrical safety warning on this page.

Support Across Secondary Connection Requirements

Precision AGL Solutions can support secondary connection requirements across airport lighting projects, including:

Our Support

  • Secondary lead selection
  • Transformer compatibility review
  • Fixture compatibility review
  • Connector matching
  • Replacement lead identification
  • AGL rehabilitation projects
  • New airport lighting installations
  • Technical documentation

Procurement Information for Indian Projects

Indian public tenders commonly ask for the documents below. State which ones your tender requires when you send the enquiry, so they are covered in the quotation.

  • Manufacturer / OEM authorisation
  • Country of origin and local-content declaration (for Make in India purchase preference)
  • Type-test and routine-test certificates, and the FAA / ICAO / IEC compliance documents named in the specification
  • Datasheets, drawings and installation instructions
  • Warranty, delivery period and spares support
  • GeM catalogue or tender-portal requirements, where applicable

Request AGL Secondary Lead Selection

Need to identify the correct secondary lead for an AGL fixture or transformer? Send us the transformer model, fixture model, required lead length and existing connector details for compatibility checking. Provide your transformer and fixture details for a project-specific secondary lead and connector recommendation.

Submitting opens your email client with the enquiry pre-filled. You can also email us directly at the address shown.

Engineering Note

Secondary lead selection is configuration-dependent. Transformer interface, fixture connection, conductor construction, insulation, lead diameter, length, bending requirements, connector compatibility and installation environment should be verified together before procurement. Final installation should follow the approved manufacturer’s instructions and applicable airport/project requirements.

Product Disclaimer

Product availability, configuration, dimensions, electrical characteristics, photometric performance, certifications and compliance status depend on the selected manufacturer and project specification. The technical values published on this page should not be treated as a substitute for the manufacturer's current approved Technical Data Sheet.

Final selection shall be based on the approved project specification, applicable aviation standards, authority requirements, manufacturer documentation and site conditions. Use of this page is also subject to the Legal Notice, Disclaimer & Terms of Use.

Standards and editions referenced on this site are listed on the Standards Reference page.