Cable Infrastructure

AGL Marker Posts for Cable Route Identification

Visible identification of buried AGL services

Primary & Secondary RoutesJunctions, Crossings & HandholesNew & Rehabilitation Projects

Marker posts give visible identification of underground cable routes, infrastructure and selected equipment locations, helping maintenance personnel find buried AGL services and field connection points without relying solely on underground drawings or records.

Supplied by Precision AGL Solutions

AGL Marker Posts

What It Is

Marker posts identify underground cable routes, infrastructure and selected airfield equipment locations. They are configured for the cable route, identification requirements, site conditions and project specifications.

Key Features

  • Visible identification of underground AGL infrastructure
  • Supports cable-route identification and maintenance
  • Suitable for primary and secondary cable routes
  • Positioned at selected junction and crossing locations
  • Configurable marking and identification information
  • Material selected for outdoor airfield conditions
  • Suitable for new and existing infrastructure
  • Coordinated with cable records and site drawings

Where Marker Posts Are Used

Primary routesPrimary AGL cable routes.
Secondary routesSecondary cable routes.
CrossingsCable crossing locations.
Junction pointsJunction points, junction pits and handholes.
Underground & equipmentUnderground field infrastructure and equipment locations.
RehabilitationAirport rehabilitation and maintenance projects, cable-route identification systems.

Specification Overview

ParameterSpecification
HeightProject and visibility requirements dependent
MaterialSelected according to application
ColourProject and identification requirements dependent
Marking methodPrinted, engraved, labelled or project specific
IdentificationCable route, circuit or infrastructure dependent
FoundationDirect installation or suitable fixing arrangement
Environmental performanceSelected for outdoor airfield conditions
InstallationRoute, junction and field infrastructure dependent

A Visible Reference for Buried Cables

Role

Marker posts help maintenance personnel locate buried infrastructure during inspection, testing and repair. Identification can include relevant cable, circuit or infrastructure references per the project documentation.

Principle

Keep the marking arrangement consistent with the project's cable identification system.

Series-Circuit Cables Between CCRs and Transformers

Role

Primary AGL series-circuit cables are commonly buried between CCR equipment, field transformers and associated lighting circuits. Markers at selected points indicate buried infrastructure and support maintenance.

Coordinate With

  • Cable route drawings, circuit identification
  • Crossing locations, junction points
  • Transformer locations, junction pits and handholes
  • Existing airport infrastructure

Between Isolating Transformers and Fixtures

Role

Marker posts can identify selected secondary cable routes where route identification is required.

Principle

The identification system should correspond with the project's equipment and cable records.

Locating Underground Infrastructure

Typical Locations

  • Junction pits, handholes
  • Cable joints, cable crossings
  • Branch routes, equipment interfaces

Benefit

Clear identification can reduce the time needed to locate underground infrastructure during maintenance.

Selected for the Project Identification System

Possible Information

  • Cable or circuit reference, equipment reference
  • Route and junction identification
  • Warning or service identification
  • Project-specific coding

Principle

The final legend and marking format should follow the approved project documentation.

Outdoor Installation

Material Selection Should Consider

  • Weather resistance, UV exposure
  • Mechanical durability, visibility
  • Corrosion resistance where applicable
  • Long-term legibility of markings

Exposure

Posts may face sunlight, rain, temperature variation, soil contact and routine airfield maintenance activities.

Locations From the Approved Drawings

RouteCable or infrastructure route
LocationMarker-post location, required height
LegendIdentification legend, material and colour
FoundationFoundation or fixing arrangement
VisibilityVisibility from the required approach direction
ClearanceAircraft and vehicle movement areas
ServicesExisting underground services, project requirements

Installation should avoid interference with aircraft, vehicles, maintenance equipment and other airfield operations.

Buried Cables Are Not Visible After Installation

Role

Marker posts give a reference for the approximate location of the crossing and support future maintenance or civil works.

Records

Record the position accurately in the project's as-built documentation.

A Consistent Identification System

Coordinate With

  • Cable ducts, cable protection
  • Junction pits, handholes
  • Primary cable, secondary cable routes
  • Cable identification tags

Result

This creates a consistent identification system across the underground AGL infrastructure.

Visible and Accessible, Never an Obstruction

Check During Inspection

  • Damage or displacement, loose foundations
  • Faded or illegible markings
  • Corrosion or material deterioration
  • Obstruction by vegetation or soil
  • Changes to surrounding infrastructure

Action

Replace damaged or missing posts according to the approved identification scheme. Position posts so they do not obstruct aircraft or vehicle operations.

Where Existing Identification Is Inadequate

Use

Markers can be added or replaced during rehabilitation projects where existing underground cable identification is inadequate.

Existing Installations

Coordinate with available cable drawings, survey information and verified field locations before installing new markers.

A Marker Post Is Not a Statement That the Cable Is Dead

Treat Every Marked Cable as Live

Primary AGL cables carry series-circuit current at up to 5,000 V insulation class. A post shows the route only. Before any excavation, follow the airport permit-to-work and cable-locate procedure, and never assume a marked cable is de-energised. Never cut or open an energised series circuit.

Siting on the Airfield

Equipment on the operational area must be frangible and mounted as low as its function allows (Annex 14, Vol. I, Chapter 9). Confirm with the airport before placing any post inside a runway or taxiway strip. Posts must not obstruct aircraft, vehicles, signs or lights, and must not be a substitute for accurate as-built records.

Established for the Specific Site

References

  • ICAO Annex 14, Vol. I, Chapter 9: siting and frangibility of equipment on operational areas
  • ICAO Doc 9157 Part 5: electrical systems, and Part 6: frangibility
  • FAA AC 150/5340-30J: design and installation details for airport visual aids
  • FAA AC 150/5370-10 (Item L-108): installation of underground airport power cable
  • DGCA India requirements and the airport cable-records system

Project Requirements

Height, material, colour, marking method, foundation and legend follow the site cable-marking system. Record every post in the as-built drawings.

AGL Marker Posts — Frequently Asked Questions

What are AGL marker posts used for?

Marker posts give visible identification of underground cable routes, infrastructure and selected equipment locations. They help maintenance personnel find buried AGL services and field connection points without relying solely on underground drawings or records.

Where are marker posts placed?

Typical locations are primary and secondary cable routes, cable crossings, junction points, junction pits and handholes, cable joints, branch routes and equipment interfaces. The positions come from the approved drawings.

What information can a marker post carry?

Possible information includes a cable or circuit reference, an equipment reference, route and junction identification, warning or service identification and project-specific coding. The legend and marking method, such as printed, engraved or labelled, should follow the approved project documentation and stay consistent with the project cable identification system.

What material and construction should be used?

Material selection should consider weather resistance, UV exposure, mechanical durability, visibility, corrosion resistance where applicable and long-term legibility of the markings. Posts may face sunlight, rain, temperature variation, soil contact and routine airfield maintenance activity, so height, material and colour follow the project and identification requirements.

Are there siting restrictions on the airfield?

Equipment on the operational area must be frangible and mounted as low as its function allows, as set out in Annex 14 Volume I Chapter 9. Confirm with the airport before placing any post inside a runway or taxiway strip, and make sure posts do not obstruct aircraft, vehicles, signs or lights.

Does a marker post mean the cable is de-energised?

No. Treat every marked cable as live. Primary AGL cables carry series-circuit current at up to 5,000 V insulation class, and a post shows the route only. Before any excavation, follow the airport permit-to-work and cable-locate procedure, and never cut or open an energised series circuit. See the safety and siting notes on this page.

How are marker posts installed?

Installation follows the approved drawings for route, marker-post location, required height, identification legend, material and colour, and the foundation or fixing arrangement. Confirm visibility from the required approach direction, clearance from aircraft and vehicle movement areas, and the position of existing underground services.

How do marker posts help at cable crossings?

Buried cables are not visible after installation, so a post gives a reference for the approximate location of a crossing and supports future maintenance or civil works. Record the position accurately in the as-built documentation, because a post is not a substitute for accurate as-built records.

What should be inspected and maintained?

Check for damage or displacement, loose foundations, faded or illegible markings, corrosion or material deterioration, obstruction by vegetation or soil, and changes to surrounding infrastructure. Replace damaged or missing posts according to the approved identification scheme.

Can marker posts be added during rehabilitation?

Yes. Markers can be added or replaced during rehabilitation projects where existing underground cable identification is inadequate. Coordinate with available cable drawings, survey information and verified field locations before installing new markers.

Which references apply to marker posts?

References include ICAO Annex 14 Volume I Chapter 9 on siting and frangibility of equipment, ICAO Doc 9157 Parts 5 and 6, FAA AC 150/5340-30J, FAA AC 150/5370-10 (Item L-108) on installation of underground airport power cable, and DGCA India requirements and the airport cable-records system. Height, material, colour, marking method, foundation and legend follow the site cable-marking system, and every post should be recorded in the as-built drawings.

Procurement Information for Indian Projects

Indian public tenders commonly ask for the documents below. State which ones your tender requires when you send the enquiry, so they are covered in the quotation.

  • Manufacturer / OEM authorisation
  • Country of origin and local-content declaration (for Make in India purchase preference)
  • Type-test and routine-test certificates, and the FAA / ICAO / IEC compliance documents named in the specification
  • Datasheets, drawings and installation instructions
  • Warranty, delivery period and spares support
  • GeM catalogue or tender-portal requirements, where applicable

Request Cable-Marking Requirements

Precision AGL Solutions can support marker-post selection based on cable route, identification requirements, marker dimensions, material, marking method and site installation conditions. Request your cable-marking requirements.

Submitting opens your email client with the enquiry pre-filled.

Product Disclaimer

Product availability, configuration, dimensions, electrical characteristics, photometric performance, certifications and compliance status depend on the selected manufacturer and project specification. The technical values published on this page should not be treated as a substitute for the manufacturer's current approved Technical Data Sheet.

Final selection shall be based on the approved project specification, applicable aviation standards, authority requirements, manufacturer documentation and site conditions. Use of this page is also subject to the Legal Notice, Disclaimer & Terms of Use.

Standards and editions referenced on this site are listed on the Standards Reference page.

Talk to Precision AGL Solutions

Follow Precision AGL Solutions

Our Academy: Precision AGL Academy