How do requirements flow into AGL inspection?
Turn each checkable requirement into an inspection item with a clear pass criterion, then record, classify and close every finding.
The inspection requirement flow turns the requirement list into an inspection plan: what to check, where, how often, by whom, and what counts as a pass. The inspection is then carried out, the findings are recorded, classified and closed out.
An inspection without criteria produces opinions rather than evidence. Give each item a measurable criterion with its source, keep the record, and update the compliance matrix only when a defect is cleared and re-inspected.
- List checkable requirements. Pick those that can be proved by inspection.
- Write the plan. Item, location, method, frequency, responsible person and criterion.
- Inspect safely. Use the site permit and isolation procedure where needed.
- Record and classify. Capture values and photos, then grade each finding.
- Close out. Complete the action, re-inspect and update the records.
Criteria are set in advance from the requirements, so results are consistent and traceable.
No criteria, so findings are subjective, hard to compare and hard to defend later.
Frequently Asked Questions
Q1How do inspection requirements come from the design?
Each requirement that can be checked by looking, measuring or comparing becomes an inspection item. The design and governing documents give the criteria, so the inspection plan can say what to check and what a pass looks like.
Q2What makes a good pass criterion?
It is specific enough that two inspectors would reach the same result, and it points to its source, such as a specification clause or manufacturer limit. Vague criteria like looks fine lead to inconsistent results.
Q3What goes in an inspection record?
The item and location, the date and inspector, what was observed or measured, the criterion it was compared with, the result, and any action raised. Photos and measured values make the record far more useful later.
Q4What happens when a defect is found?
Classify it against the agreed scheme, decide whether to accept, repair or escalate, and record the action. After a repair, inspect again and update the record and compliance matrix before closing the item.
Q5How is inspection different from testing?
Inspection examines the equipment or installation against criteria, often by looking, checking and simple measurement. Testing applies a defined procedure to measure performance, such as a circuit test. Both draw on the same requirement list.
See It. Understand It. Then Learn How to Engineer It.
Recognising an AGL system visually is the first step. The next step is knowing how to design, install, test, commission and maintain them correctly.
Build Practical AGL Engineering Skills
Go deeper with structured training from Precision AGL Academy, covering:
Learn how each light, sign and circuit works as part of a complete airport lighting system, not just as an isolated diagram.