Does the cable survive far more voltage than it will ever carry?

Insulation resistance measures how good the insulation is. A hi-pot test asks a harder question: does it hold at a voltage well above normal? The cable is stressed under control so a weak spot fails on the test, not on a live runway circuit.

1 · THE SETUP: ISOLATED CABLE, VOLTAGE TO EARTH 2 · THE TEST: RAMP, HOLD, WATCH THE LEAKAGE CABLE DEAD, LOCKED OUT, DISCONNECTED AT BOTH ENDS HI-POT CURRENT TRIP JOINT TEST VOLTAGE ON THE CONDUCTOR FAR END: CAPPED, CLEAR RETURN TO EARTH EARTH / SOIL LEAKAGE THROUGH THE INSULATION BEFORE ANY VOLTAGE IS APPLIED 1 · CCR LOCKED OUT AND DISCONNECTED FROM THE LOOP 2 · TRANSFORMERS, LAMPS, CONNECTORS DISCONNECTED 3 · FAR END CAPPED, BARRIERS AND WARNING SIGNS UP 4 · INSULATION RESISTANCE ALREADY PASSED 5 · TEST VOLTAGE, TIME, RAMP RATE AND TRIP SET TEST VOLTAGE ABOVE THE RATED VOLTAGE, FOR A SET TIME I = V ÷ R HIGH R GIVES A TINY, STEADY LEAKAGE TEST VOLTAGE AGAINST TIME RATED / OPERATING VOLTAGE RAMP UP HOLD FOR THE SET TIME RAMP DOWN DISCHARGE LEAKAGE CURRENT AGAINST TIME CHARGING SURGE STEADY LEAKAGE: PASS BREAKDOWN OR CLIMBING LEAKAGE: FAIL PASS: NO BREAKDOWN AND LEAKAGE WITHIN THE LIMIT THEN DISCHARGE, EARTH AND RETEST INSULATION RESISTANCE A TRIP ENDS THE TEST: LOCATE THE FAULT, REPAIR, RETEST INSULATION RESISTANCE FIRST · ISOLATE · RAMP UP · HOLD · WATCH LEAKAGE · RAMP DOWN · DISCHARGE · RETEST
cable under test
test voltage and failure
leakage current and earth
The Fact Testing & commissioning

A high-potential (hi-pot) test, also called a dielectric withstand test, applies a voltage well above the cable's rated voltage between the conductor and earth for a set time, with the circuit de-energised. It is a proof test with a simple question: does the insulation hold, or does it break down? A cable that passes has shown it can take more than service will ever ask of it, so a weak joint or a damaged length fails on the test rather than on a live airfield circuit.

1How it differs from insulation resistance

Both tests apply voltage between the conductor and earth, but they answer different questions. Insulation resistance uses a modest DC voltage and measures the insulation in megohms. A hi-pot test uses a much higher voltage and proves the insulation withstands it. The insulation-resistance test comes first, because a cable that already reads low should not be stressed further.

TestVoltageQuestion it answersResultRisk to the cable
Insulation resistanceModest DC, set by the cable ratingHow good is the insulation?A value in megohms, kept as a baselineLow
Hi-pot (withstand)Well above the rated voltage, per the specificationDoes it hold at high stress?Pass or fail, plus the leakage currentHigher: it is a stress test

2The sequence on site

The specification sets the test voltage, the hold time, the ramp rate and the leakage limit, taken from the cable data and the standard in use. The steps are the same each time:

  1. Isolate and prove dead. Lock out the CCR and disconnect it from the loop.
  2. Take out everything that is not cable. Disconnect the isolation transformers, lamps and connectors so that only the cable and its joints are stressed.
  3. Cap the far end and clear the area. Cap the far end, put up barriers and warning signs, and keep everyone clear of the cable and its far end.
  4. Pass insulation resistance. A cable that already reads low is not stressed further.
  5. Ramp up, hold, ramp down. Ramp up at the set rate, hold for the set time while watching the current, then ramp down.
  6. Discharge, earth and retest. Discharge and earth the cable, then measure insulation resistance again and compare it with the reading before the test.

3Why the current is watched

A cable acts as a capacitor, so raising the voltage first draws a charging current. It scales with how fast the voltage rises, which is why a slow, controlled ramp matters:

Icharge = C × dV ÷ dtC is the cable's capacitance and dV÷dt the ramp rate. Illustration: 0.5 µF ramped at 1 kV per second draws about 0.5 mA while the voltage is rising.

When the voltage stops rising, the surge dies away and only a small leakage current through the insulation remains, following Ohm's law:

I = V ÷ RIllustration only, not a test level: 10 kV across 1,000 MΩ of insulation gives about 10 µA. Healthy insulation holds this small and steady during the hold.

The tester has a current trip that cuts the voltage if the current exceeds a set limit, which is what a breakdown looks like. The ramp is also watched for a current that keeps climbing in the hold, which points to moisture or deterioration before the insulation fails outright.

4DC, or very low frequency AC

The specification names the type of voltage. DC testers are small and easy to carry to site. Very low frequency (VLF) AC, at about 0.1 Hz, gives a stress closer to what the cable sees in service with equipment that is still portable, and power-frequency AC is closest of all but needs heavy kit. Many cable standards discourage DC on aged extruded cable, so follow the cable maker's advice and the project specification rather than a habit.

5Reading the result

What you seeWhat it usually meansWhat to do
Voltage held, current settles low and steadyInsulation withstands the testRamp down, discharge, retest insulation resistance, record
Surge on the ramp that settlesNormal capacitive chargingNo action; slow the ramp if it trips the limit
Current keeps climbing in the holdMoisture, damage or deteriorating insulationStop and discharge; do not energise; find the cause
Breakdown and tester tripA weak spot has failedLocate with TDR or bridge methods, repair, retest from the start
Readings wander or will not repeatSurface leakage across dirty or damp cable endsClean and dry the terminations, then repeat

6When it is used, and when it is not

A hi-pot test is called for on new cable and new joints at acceptance, and after a repair where the specification asks for one. It is a stress, so it can finish off insulation that was already marginal. Run it only where the specification calls for it, at the specified level and time, and do not repeat it without reason. It is a cable test, not an equipment test: the regulator, isolation transformers, connectors and lamps have their own tests and ratings, and are kept out of it.

7Safety, and the record

The voltages are lethal even at tiny currents. Use barriers and warning signs, keep a clear exclusion zone around the whole cable and its far end, and make sure everyone on the circuit knows the test is under way. The cable stores charge, and after it is earthed some voltage can slowly return (dielectric absorption), so discharge it through the tester's discharge path, keep the earth connected, and only then handle or reconnect it. Record the test voltage, hold time, leakage current, conditions, tester and calibration date, and the result, with the cable records.

Diagram values are illustrative. Test voltage, time and limits come from the cable specification, the standard in use and the instrument manufacturer's procedure, and work follows the airport's isolation and permit-to-work rules. References: ICAO Doc 9157 Pt 5; FAA AC 150/5370-10 (Item L-108); FAA AC 150/5340-26.
Entry 11 · Cable fault location (TDR and bridge methods) Entry 13 · Insulation-resistance trend analysis over time

Frequently Asked Questions

Q1What is the difference between a hi-pot test and an insulation-resistance test?

An insulation-resistance test applies a modest DC voltage and reads the insulation in megohms, so it measures how good the insulation is. A hi-pot test applies a voltage well above normal for a set time and asks only whether the insulation withstands it without breaking down. Insulation resistance is done first, and the hi-pot test is a proof test that follows it.

Q2Why are the CCR, transformers and lamps kept out of a hi-pot test?

The test voltage is chosen for the cable and is higher than those items are built to take. The regulator, isolation transformers, connectors and lamps are disconnected so that the voltage stresses only the cable and its joints, and so that nothing rated lower is damaged. Equipment is tested separately to its own requirements.

Q3Why does the current jump when the voltage is first raised?

A cable behaves like a capacitor, and raising the voltage charges it. The charging current is proportional to how fast the voltage rises, so a slow, controlled ramp keeps the surge small. It then settles to a small steady leakage current. A current that keeps climbing during the hold is a warning of weak insulation.

Q4Is the test done with DC or AC?

Either can be specified. DC testers are small and easy to carry to site. Very low frequency AC at about 0.1 Hz gives a stress closer to service, and many cable standards discourage DC on aged extruded cable. Follow the cable maker's advice and the project specification for the type, level and time.

Q5Can a hi-pot test damage a good cable?

A sound cable should not be harmed by a correctly specified test, but the test is a stress and it can finish off insulation that was already marginal. For that reason it is run only where the specification calls for it, at the specified level and time, and not repeated without reason. The failure is better found on the test than on a live circuit.

Q6What happens when the hold time ends?

The voltage is ramped down, then the cable is discharged and earthed. It stores charge like a capacitor, and after earthing some voltage can return slowly, an effect called dielectric absorption. So the earth stays connected until the cable is handled or reconnected, and insulation resistance is measured again to confirm nothing changed.

Precision AGL Academy

See It. Understand It. Then Learn How to Engineer It.

Recognising an AGL system visually is the first step. The next step is knowing how to design, install, test, commission and maintain them correctly.

Build Practical AGL Engineering Skills

Go deeper with structured training from Precision AGL Academy, covering:

AGL Fundamentals Design & Electrical Engineering Approach Lighting Photometry Installation & Commissioning Maintenance & Troubleshooting

Learn how each light, sign and circuit works as part of a complete airport lighting system, not just as an isolated diagram.

See. Understand. Apply. Engineer.