The 25 forms that make every AGL airfield sign — internally illuminated, externally illuminated where applicable, mandatory, informational, location and direction — an individually traceable engineering asset. This division carries each sign through Design/Identification, Installation, Location, Electrical Connection, Illumination, Photometry, Visibility, Compliance, Acceptance, Maintenance, Failure, Repair/Replacement and Asset Lifecycle, acting as the sign-specific control layer rather than duplicating the detailed installation, testing, photometry, calibration, cable/connector and asset-management records held elsewhere in the library.
Where this fits — Division 18 is the master documentation and lifecycle-record layer for airfield signs, integrating with Division 04 (Installation), Division 05 (Inspection), Division 06 (Testing), Division 09 (Failure Investigation), Division 11 (Asset Management), Division 14 (Calibration), Division 15 (Photometry) and Division 16 (Cable, Connector & Electrical Circuit Records). It should not duplicate those detailed records — instead every sign becomes individually traceable, from Sign ID through Location, Installation, Circuit, Transformer/Driver, Connector, Earthing, Illumination Test, Photometric Test, Visibility Inspection, Compliance, Acceptance, Asset Register, Maintenance, Failure and Repair/Replacement, into the Sign Lifecycle Record.
A · Sign Installation & Identification
4 of 4 formsSGN-01 Sign Installation Checklist Checklist
Purpose
The master checklist confirming that the airfield sign has been correctly installed and is ready for inspection and testing.
Key Fields
- Airport / Project / Sign ID / Sign type / Sign designation-text
- Location / Runway-taxiway-apron / Drawing reference / Installation date / Installer
- Foundation-base, mounting structure, sign housing, orientation, height
- Location, clearance, frangibility requirements where applicable
- Mechanical stability, drainage, access provisions
- Cable connection, connector, transformer, driver, earthing, circuit identification
- Final status: Accepted / Defective / Rectification Required
SGN-02 Sign Inspection Form Inspection
Purpose
For routine inspection of the physical, electrical and visual condition of an airfield sign.
Key Fields
- Housing: damage, corrosion, cracks, water ingress, contamination
- Face/legend: correct legend, legibility, colour, damage, fading, obstruction
- Illumination: uniformity, dark areas, flickering, LED condition, driver condition
- Structure: mounting, bolts, foundation, alignment, physical stability
- Electrical: cable, connector, transformer, driver, earthing
- Result: Normal / Defect / Critical Defect
SGN-03 Sign Identification Record Record
Purpose
To establish unique identification of every airfield sign.
Key Fields
- Sign ID, sign type, sign designation, legend
- Manufacturer, model, serial number, asset number
- Location / associated circuit
- Classification: mandatory instruction, location, direction, destination, runway/taxiway designation, other applicable category
- Verification: physical label, drawing, asset register, circuit schedule
SGN-04 Sign Location Record Record
Purpose
To establish the exact installed location of each airfield sign.
Key Fields
- Sign ID / Airport / Runway-taxiway / Chainage-reference
- Coordinates where applicable / side of pavement / distance from pavement edge
- Orientation / elevation / installation reference
- Verification: survey checked, drawing checked, field location verified, as-built updated
B · Sign Electrical System
3 of 3 formsSGN-05 Sign Circuit Record Record
Purpose
To establish the complete electrical connection of the sign.
Key Fields
- Sign ID / Circuit ID / CCR ID where applicable
- Cable ID / Transformer ID / Connector ID / Driver ID / distribution-control reference
- Cable size, cable length, circuit sequence, connection point, isolation arrangement
- Testing: continuity, insulation resistance, current, voltage, functional operation
SGN-06 Sign Transformer Record Record
Purpose
To maintain traceability of the isolating transformer associated with the sign.
Key Fields
- Transformer ID / Sign ID / manufacturer / model / serial number / rating / installation date
- Primary rating / secondary rating / current rating / circuit ID
- Testing: continuity, insulation resistance, ratio/other applicable verification, connection verification
- Lifecycle: maintenance, failure, replacement, warranty
SGN-07 Sign Illumination Test Test
Purpose
To verify proper electrical and visual illumination of the sign.
Key Fields
- Sign ID / circuit / CCR-intensity setting where applicable / ambient conditions / test date
- Sign energized, all modules operating, uniform illumination, no dark sections
- No flickering, no abnormal colour, correct intensity
- Measurements: voltage, current, applicable intensity/output measurement
- Result: Pass / Fail
C · Sign Photometry & Visibility
3 of 3 formsSGN-08 Sign Photometric Test Test
Purpose
To verify the photometric performance of the sign.
Key Fields
- Sign ID / photometer ID / calibration status / test date / test operator
- Measurements: light intensity, uniformity, colour, applicable angular measurements, operating intensity
- Results: required value, measured value, deviation, pass/fail
- References: applicable design requirement, project specification, applicable ICAO/FAA/DGCA requirements as applicable
SGN-09 Sign Visibility Inspection Inspection
Purpose
To verify that the sign remains clearly visible to the intended aircraft/vehicle operator.
Key Fields
- Legend visibility, contrast, illumination, obstruction, viewing angle, glare
- Physical visibility, contamination, vegetation/obstruction, pavement/environmental conditions
- Operational assessment: clearly visible / reduced visibility / poor visibility / not visible
- Action: clean, repair, realign, replace, investigate
SGN-10 Sign Alignment Record Record
Purpose
To document orientation and alignment of the sign.
Key Fields
- Sign ID / reference direction / required orientation / actual orientation / deviation
- Measurement equipment / date
- Checks: horizontal alignment, vertical orientation, structural position, viewing direction
- Result: Within Requirement / Adjustment Required
D · Cleaning & Maintenance
4 of 4 formsSGN-11 Sign Cleaning Record Record
Purpose
To document cleaning activities affecting optical performance and visibility.
Key Fields
- Sign ID / date / technician / cleaning method / cleaning material
- Face cleaning, lens/window cleaning, housing cleaning
- Visibility before / visibility after / illumination before / illumination after
- Defects observed
- Result: Restored / Further Maintenance Required
SGN-12 Sign Maintenance Record Record
Purpose
To maintain complete maintenance history of the sign.
Key Fields
- Maintenance type: preventive, corrective, emergency, inspection-driven
- Activities: cleaning, electrical inspection, LED inspection, driver inspection, connector inspection
- Transformer inspection, housing repair, structural work, alignment, earthing
- Record: work order, date, technician, parts used, test results, final condition
SGN-13 Sign Repair Record Record
Purpose
To document repair of defective sign components.
Key Fields
- Sign ID / failure-defect ID / problem description / cause / component affected
- Repair action, parts used, technician, date, work duration
- Verification: illumination, electrical test, photometric test where required, visibility
- Closure: Repaired / Further Action Required
SGN-14 Sign Replacement Record Record
Purpose
To document complete replacement of a sign or major component.
Key Fields
- Existing: sign ID, manufacturer, model, serial, installation date, failure/replacement reason
- New sign: manufacturer, model, serial number, sign type, legend, asset ID, installation date
- Verification: location, alignment, electrical connection, illumination, photometry, functional test
- Documentation: asset register updated, drawing updated, warranty registered
E · Component Replacement
3 of 3 formsSGN-15 Sign Failure Report Report
Purpose
To record any sign failure or abnormal condition.
Key Fields
- Failure ID / Sign ID / date-time / circuit / operating condition / symptoms
- Failure categories: complete illumination failure, partial failure, LED failure, driver failure, transformer failure
- Cable failure, connector failure, water ingress, structural damage, optical degradation, mechanical damage
- Action: temporary restoration, repair, component replacement, sign replacement, retesting
SGN-16 LED Module Replacement Replacement Record
Purpose
To establish traceability of LED module replacement.
Key Fields
- Sign ID / module ID / manufacturer / model / failure reason / operating hours where available
- New module ID / manufacturer / model / batch-lot / installation date / technician
- Verification: electrical connection, illumination, uniformity, colour, photometry where required
- Final: Accepted / Retest Required
SGN-17 Driver Replacement Replacement Record
Purpose
To document replacement of LED driver/power supply equipment.
Key Fields
- Existing driver: driver ID, manufacturer, model, rating, serial number, failure reason
- New driver: driver ID, manufacturer, model, rating, serial/batch, installation date
- Testing: input voltage, output voltage/current, sign illumination, functional operation
- Closure: Accepted / Rework Required
F · Housing & Structural Control
2 of 2 formsSGN-18 Sign Housing Inspection Inspection
Purpose
To inspect the sign enclosure and optical housing.
Key Fields
- Housing integrity, seals, gaskets, access doors, hinges, fasteners
- Corrosion, cracks, water ingress, dust contamination, optical window, internal condition
- Classification: Good / Minor Deterioration / Major Deterioration / Replace
SGN-19 Sign Structural Inspection Inspection
Purpose
To assess the physical support structure and mounting system.
Key Fields
- Support posts, mounting brackets, bolts, foundation
- Corrosion, deformation, cracks, stability, frangibility provisions where applicable
- Checks: alignment, mechanical integrity, foundation condition, ground clearance, damage
- Result: Safe / Monitor / Repair / Replace
G · Electrical Connection & Earthing
2 of 2 formsSGN-20 Sign Connector Record Record
Purpose
To establish traceability of connectors associated with the sign.
Key Fields
- Connector ID / Sign ID / Cable ID / Transformer-driver ID / manufacturer / model / installation date
- Inspection: connector condition, contact condition, sealing, mechanical security, damage, moisture ingress
- Testing: continuity, connection verification, insulation-related checks where applicable
SGN-21 Sign Earthing Record Record
Purpose
To document the earthing arrangement and verification of the sign.
Key Fields
- Sign ID / earthing point / earth conductor / connection point / earth electrode-grid reference / earth continuity
- Checks: physical connection, bonding, continuity, corrosion, mechanical security
- Test: test equipment ID, calibration status, measurement, acceptance criterion, pass/fail
H · Compliance & Acceptance
2 of 2 formsSGN-22 Sign Compliance Checklist Checklist
Purpose
To verify the complete compliance of an airfield sign before acceptance or during audit.
Key Fields
- Identification: correct sign type, correct designation, correct legend
- Location: correct position, correct orientation, required clearance
- Physical: housing, structure, foundation, frangibility where applicable
- Electrical: cable, transformer, connector, driver, earthing
- Optical: illumination, colour, uniformity, photometry, visibility
- Documentation: drawings, test reports, certificates, asset record, warranty
- Final: Compliant / Non-Compliant / Conditional
SGN-23 Sign Acceptance Certificate Certificate
Purpose
To formally certify that the installed/repaired/replaced sign has met the applicable acceptance requirements.
Key Fields
- Acceptance basis: installation inspection, electrical testing, illumination test, photometric test
- Visibility inspection, alignment verification, earthing verification, defect closure
- Certificate information: Sign ID, project, location, date, test report references, inspection references
- Acceptance status: Accepted / Accepted with Conditions / Not Accepted
- Signatures: Contractor, Engineer, QA/QC, Client/Authorized Representative
I · Asset & Lifecycle Management
2 of 2 formsSGN-24 Sign Asset Register Register
Purpose
The master asset record for every airfield sign.
Key Fields
- Asset ID / Sign ID / sign type / legend / location / runway-taxiway
- Manufacturer / model / serial number
- Technical information: dimensions, electrical rating, light source, driver, transformer, circuit, connector
- Lifecycle: installation date, commissioning date, warranty, maintenance/failure/replacement/modification history
- Condition: current condition, criticality, asset health, remaining useful life, replacement priority
SGN-25 Sign Lifecycle Record Record
Purpose
To document the complete lifecycle of the sign from installation through replacement or disposal.
Key Fields
- Lifecycle stages: planning, procurement, installation, testing, acceptance
- Operation, inspection, maintenance, failure/repair, replacement/upgrade, decommissioning
- Lifecycle information: installation date, commissioning date, maintenance events, failure events
- Component replacements, major repairs, performance trends, cost history
- Warranty claims, replacement decision, disposal date
How Division 18 Connects
These 25 forms build an individually traceable engineering history for every airfield sign — from its physical location and electrical circuit through photometric performance, maintenance, failure history and eventual replacement — without duplicating the detailed records held in the divisions it draws on.
Sign Control Flow
The nine categories in this division follow the sign's control philosophy from identification to lifecycle decision:
Related Divisions
- Division 04 — Installation Forms (field installation records the sign installation checklist and location record trace back to)
- Division 06 — Testing & Commissioning Forms (electrical/functional testing methodology behind the illumination test)
- Division 09 — Failure Investigation Forms (detailed root-cause analysis behind the Sign Failure Report)
- Division 11 — Asset Management Forms (enterprise asset lifecycle the Sign Asset Register feeds into)
- Division 15 — Photometry & Optical Testing Forms (detailed photometric measurement behind the Sign Photometric Test)
- Division 16 — Cable, Connector & Electrical Circuit Records (cable and connector traceability behind the Sign Circuit Record)
Frequently Asked Questions
Quick answers about the 25 Division 18 Airfield Sign forms, how they are grouped, and how they connect to the rest of the library.
Q1What is Division 18 — Airfield Sign Forms in the AGL Engineering Forms & Templates library?
Division 18 is a set of 25 airfield sign forms (SGN-01 to SGN-25) in the AGL Engineering Forms & Templates library. It makes every AGL airfield sign an individually traceable engineering asset, carrying it through identification, installation, location, electrical connection, photometry and visibility, maintenance, failure history, compliance and eventual replacement. The forms are grouped into 9 categories: Sign Installation & Identification, Sign Electrical System, Sign Photometry & Visibility, Cleaning & Maintenance, Component Replacement, Housing & Structural Control, Electrical Connection & Earthing, Compliance & Acceptance and Asset & Lifecycle Management.
Q2Which forms are included in Sign Installation & Identification, Sign Electrical System and Sign Photometry & Visibility?
Sign Installation & Identification (4 forms): SGN-01 Sign Installation Checklist, SGN-02 Sign Inspection Form, SGN-03 Sign Identification Record, SGN-04 Sign Location Record; Sign Electrical System (3 forms): SGN-05 Sign Circuit Record, SGN-06 Sign Transformer Record, SGN-07 Sign Illumination Test; Sign Photometry & Visibility (3 forms): SGN-08 Sign Photometric Test, SGN-09 Sign Visibility Inspection, SGN-10 Sign Alignment Record.
Q3Which forms are included in Cleaning & Maintenance, Component Replacement and Housing & Structural Control?
Cleaning & Maintenance (4 forms): SGN-11 Sign Cleaning Record, SGN-12 Sign Maintenance Record, SGN-13 Sign Repair Record, SGN-14 Sign Replacement Record; Component Replacement (3 forms): SGN-15 Sign Failure Report, SGN-16 LED Module Replacement, SGN-17 Driver Replacement; Housing & Structural Control (2 forms): SGN-18 Sign Housing Inspection, SGN-19 Sign Structural Inspection.
Q4Which forms are included in Electrical Connection & Earthing, Compliance & Acceptance and Asset & Lifecycle Management?
Electrical Connection & Earthing (2 forms): SGN-20 Sign Connector Record, SGN-21 Sign Earthing Record; Compliance & Acceptance (2 forms): SGN-22 Sign Compliance Checklist, SGN-23 Sign Acceptance Certificate; Asset & Lifecycle Management (2 forms): SGN-24 Sign Asset Register, SGN-25 Sign Lifecycle Record.
Q5What is the difference between the Sign Illumination Test, Sign Photometric Test and Sign Visibility Inspection?
The Sign Illumination Test (SGN-07) verifies proper electrical and visual illumination of the sign. The Sign Photometric Test (SGN-08) verifies its photometric performance, and the Sign Visibility Inspection (SGN-09) verifies that the sign remains clearly visible to the intended aircraft or vehicle operator.
Q6Which forms cover sign repair and component replacement?
The Sign Failure Report (SGN-15) records any sign failure or abnormal condition, and the Sign Repair Record (SGN-13) documents repair of defective components. The LED Module Replacement (SGN-16) and Driver Replacement (SGN-17) forms record replacement of those components, and the Sign Replacement Record (SGN-14) documents complete replacement of a sign or major component.
Q7How is a sign accepted and tracked across its life?
The Sign Compliance Checklist (SGN-22) verifies compliance before acceptance or during audit, and the Sign Acceptance Certificate (SGN-23) certifies that an installed, repaired or replaced sign has met the applicable acceptance requirements. The Sign Asset Register (SGN-24) is the master asset record for every sign, and the Sign Lifecycle Record (SGN-25) documents its life from installation through replacement or disposal.
Q8Can the forms in Division 18 be downloaded and filled in?
Yes. Each form has a Download as Word button that produces an uncontrolled sample Word template with letterhead, a document-control block, ruled entry fields and a three-tier approval table, ready to print or fill on-screen. Checklist-format forms such as Sign Installation Checklist (SGN-01) download with a checkbox and a verified-by line for each item. The forms can also be searched by keyword or form ID.
Q9How does Division 18 connect to the other divisions?
Division 18 is the master documentation and lifecycle-record layer for airfield signs. It integrates with the installation, inspection, testing, failure investigation, asset management, calibration and photometry divisions, and it does so without duplicating the detailed records held in them.
PLACE THE SIGN. UNDERSTAND THE MESSAGE.
An airfield sign form confirms legibility and condition — but real competence means understanding mandatory vs information signage rules, colour-coding standards and what a pilot needs from that sign at that exact location.
Take your knowledge further with Precision AGL Academy.
Build Complete AGL Project Capability
Learn how technical AGL work connects with:
Develop the knowledge to not only record the work, but understand the engineering and project-management principles behind it.
Plan the project. Understand the engineering. Deliver with confidence.
Follow the Academy
Important Notice, Disclaimer & Limitation of Liability
Please read before relying on any content on this page or on any template downloaded from it.
- Purpose and intended users. This page is an independent educational and informational reference for competent, suitably trained and authorised airfield ground lighting (AGL), aerodrome electrical and project personnel. It is not professional engineering, legal or regulatory advice, and using it does not create any professional or client relationship.
- Sample templates, not controlled documents. Forms, checklists, registers, reports, certificate layouts and Word downloads are generic samples. They are uncontrolled copies and are not approved work instructions, procedures, permits, certificates, test or calibration records, or regulatory records. Letterheads, form numbers, revision labels, dates, document-control blocks and approval tables are layout only. Review and adapt a template under your own document-control system before any use; signatures on it carry no authority unless made under your own approved system. Precision AGL Academy does not issue, approve, certify or take responsibility for any record completed using a template, and does not receive or store such records.
- Safety. Work on series circuits, constant current regulators (CCRs), isolating transformers, cables, connectors and control equipment can be fatal. Always apply the aerodrome’s permit-to-work and isolation/LOTO procedures, prove dead, use correctly rated instruments and PPE, and follow the manufacturer’s instructions. Nothing here authorises work on live equipment or the bypassing of any safety device or interlock.
- Certificates, approvals and compliance. A completed template is not a certificate, approval, acceptance, release, permit or evidence of compliance, and listing a certificate, approval or sign-off field does not make the document valid. Reading this material or completing a template confers no certification, accreditation, competency assessment or authorisation to work on any aerodrome.
- Aviation operations. Nothing here authorises return to service, a change of operating category (CAT I/II/III), a NOTAM, a flight-inspection outcome or any aerodrome certification decision. These rest with the aerodrome operator, the air navigation service provider and the competent regulator.
- Standards, regulations and contracts. References to ICAO, FAA, IEC, IEEE, ISO, BIS, DGCA and other standards are for orientation only. They are summarised, may be incomplete or out of date, and standards are revised from time to time. Consult the current official editions. Following this content does not guarantee compliance with any law, standard, contract or regulatory approval. Contract, specification and official requirements always prevail, and nothing here is a contract document or legal advice.
- Personal and confidential data. Some templates have fields for names, signatures, training or competency records, and incident or injury details. If you record personal or confidential information on a template, you are responsible for handling it lawfully, including under India’s Digital Personal Data Protection Act, 2023 and your contracts. Word files are generated in your browser; the content you enter is not sent to us.
- Generic content; no warranty. Field lists, sequences, categories and example values are generic and indicative; real projects, installations and contracts differ. Content is provided “as is” and “as available”, without warranty of any kind, express or implied, including accuracy, completeness, currency or fitness for a particular purpose.
- Limitation of liability. To the fullest extent permitted by applicable law, Precision AGL Academy and its owners, authors and contributors are not liable for any injury, death, loss, damage, downtime, penalty, contractual dispute or regulatory consequence, whether direct or indirect, arising from the use of, reliance on, or inability to use this content or any template downloaded from it. Nothing in this notice excludes or limits any liability that cannot lawfully be excluded or limited.
- Independence and trademarks. This is an independent publication, not affiliated with or endorsed by ICAO, the FAA, the IEC, BIS, DGCA, any airport, regulator, certification body or equipment manufacturer. Third-party names, standard designations and trademarks, including Microsoft Word and Excel, belong to their respective owners and are used for identification only.
- Copyright and use. © 2026 Precision AGL Academy. All rights reserved. You may view this page and use downloaded templates for personal reference, internal training and, once adapted under your own document-control system, your own internal project records, keeping this notice attached to unadapted copies. You may not present them as approved or controlled documents, or copy, republish, redistribute, scrape or commercially use the library without our prior written permission.
- Corrections. Content is reviewed periodically, with no obligation to update. To report an error, safety concern or rights issue, write to precisionaglsolutions@gmail.com.