What are CCR loading limits and minimum-load issues?

A CCR works properly between a minimum and a maximum load. Too heavy and it cannot hold the current; too light and its power factor, efficiency and regulation can suffer.

CCR LOADING LIMITS · WORKING BETWEEN A MINIMUM AND A MAXIMUM too heavy and it cannot hold the current, too light and it regulates and runs poorly 1 THE LOADING RANGE MINIMUM RATING LIGHT DESIGN RANGE TIGHT OVER THIS CIRCUIT LAMPS FAIL FIXTURES ADDED THE LOAD DRIFTS OVER TIME zone edges are illustrative, not limits 2 TOO LIGHT LOWER POWER FACTOR less of the input kVA does work LESS ACCURATE REGULATION depends on the CCR design LOWER EFFICIENCY a large CCR on a small load BELOW THE MINIMUM LOADING check the manufacturer's data 3 TOO HEAVY CANNOT HOLD THE CURRENT high steps fall short, lamps dim OVERHEATING over rating, life shortens PROTECTION TRIPS overload or overvoltage cut-out PAST THE RATING no spare capacity left WHAT MAKES UP THE CIRCUIT LOAD LAMPS fixture power + TRANSFORMER LOSSES isolation transformers + CABLE I²R heat in the series cable = CIRCUIT LOAD checked at the top step BETWEEN MINIMUM AND RATING SIZED WITH MARGIN, TESTED LIGHT Checked at the highest step and again with lamps out OUTSIDE THE RANGE DIM LAMPS OR POOR REGULATION Overload dims lamps or trips; very light load can regulate poorly SCHEMATIC · ILLUSTRATIVE ZONES · NOT TO SCALE · LIMITS COME FROM THE CCR DATA SHEET AND THE STANDARD
design range
light loading and drift
overload and below minimum
load components
The Fact Loading range

CCR loading is the power the series circuit draws, found at the highest brightness step, compared with the CCR’s kW rating. The circuit load is the lamps, the isolation transformer losses and the cable I²R losses added together. The upper limit is the rating: a CCR pushed past it cannot hold the set current on the higher steps, so lamps run dim, and it can overheat or trip on its protection.

There is a lower limit too. A CCR that is far larger than its load is less efficient and can have a poor power factor and less accurate regulation, depending on the design, and may fall below the manufacturer’s minimum loading. The load also moves after commissioning: failed lamps lower it and added fixtures raise it, so a circuit should sit comfortably between the minimum and the rating, with margin, and be checked at both ends.

  1. Calculate the load. At the highest step: lamps, plus isolation transformer losses, plus cable I²R.
  2. Compare with the rating. Add margin for growth, ageing and tolerances, then take the next standard CCR size up.
  3. Check the minimum. Confirm the load is above the manufacturer’s minimum loading and that the CCR regulates well at light load.
  4. Test the lamps-out case. See how far the load falls as lamps fail, and whether the CCR still behaves.
  5. Correct a light load. Options include a smaller CCR, combining circuits, or other measures the manufacturer approves.
  6. Record and recheck. Log the loading, and recalculate after any fixture is added or the circuit is changed.
Too heavy

No spare capacity. The CCR cannot hold the current on the high steps, runs hot and may trip, and any added fixture makes it worse.

Too light

A large CCR on a small load. It still works, but with lower efficiency and power factor, and regulation can be less accurate, depending on the design.

Rule Circuit load must fit between the minimum loading and the rating
Upper limit The CCR kW rating, with spare capacity for growth and ageing
Lower limit The manufacturer’s minimum loading, set by the design
Load made of Lamps, isolation transformer losses and cable I²R
Weak point Sizing at the bare calculated load, or choosing a CCR far above it
Reference IEC 61822 · FAA AC 150/5345-10 · ICAO Doc 9157 Pt 5
Schematic — simplified and not to scale. The zone edges are illustrative, not specification limits. The rating, the minimum loading and the margin to allow come from the CCR data sheet, the applicable standard and the site design basis; follow them and your site’s isolation and permit-to-work procedure.
Entry 37 · CCR output waveform distortion Full Index · Division 08

Frequently Asked Questions

Q1What is CCR loading?

CCR loading is the power the series circuit draws, found at the highest brightness step, shown as a percentage of the CCR's kW rating. The circuit load is the lamps, the isolation transformer losses and the cable I²R losses added together.

Q2What happens if a CCR is overloaded?

A CCR loaded past its rating cannot hold the set current on the higher brightness steps, so the lamps run dim. It can also overheat or trip on its protection. Sizing leaves spare capacity for added fixtures, ageing and tolerances.

Q3What is the minimum-load issue?

A CCR that is lightly loaded compared with its rating is less efficient and can have a poor power factor and less accurate regulation, depending on the design. Each manufacturer states a minimum loading, and a CCR far larger than the circuit may fall below it.

Q4Why can the loading change after commissioning?

Failed lamps reduce the load, added fixtures raise it, and cable resistance changes with temperature. A circuit that was comfortably loaded when new can drift towards the light end as lamps fail or towards the limit as fixtures are added, so it is worth checking both ends.

Q5How is the right CCR size chosen?

The load is calculated at the highest step, margin is added for growth, ageing and tolerances, and the next standard CCR size up is chosen. It is then checked at light load against the manufacturer's minimum. The rating, the minimum and the margin come from the data sheet, the standard and the site design basis.

Precision AGL Academy

See It. Understand It. Then Learn How to Engineer It.

Recognising an AGL system visually is the first step. The next step is knowing how to design, install, test, commission and maintain them correctly.

Build Practical AGL Engineering Skills

Go deeper with structured training from Precision AGL Academy, covering:

AGL Fundamentals Design & Electrical Engineering Approach Lighting Photometry Installation & Commissioning Maintenance & Troubleshooting

Learn how each light, sign and circuit works as part of a complete airport lighting system, not just as an isolated diagram.

See. Understand. Apply. Engineer.