How are spare parts selected?

Four decisions, taken in order, that narrow the choice to the right spares to hold so a failure is put right quickly.

SELECTION FLOWCHART · FOUR DECISIONS IN ORDER 1FAILURE How often will it fail? Wears out or fails often → Stock from failure history Rare, but possible → Few units; MTBF is average 2IMPACT What does it put out? A whole circuit → Hold on site, restore fast One light or sign → Smaller stock, shared store 3MATCH What must it match? Type and rating → Same type, rating, connectors Approved part → Module and driver per maker 4KEEP How is it kept? On the shelf → Dry, labelled, in shelf life In the record → Register updated after use CONFIRM BEFORE STOCKING exact match · quantity from failures · where it is held · shelf life · register and warranty FLOWCHART · THE MAINTENANCE PROGRAMME AND MANUFACTURER DATA DECIDE THE FINAL CHOICE
decision stage
option and result
final check
The Fact Maintenance planning

A spare is only useful if it is the right part, in the right place, when a failure happens. The failure rate shows how many to expect, the impact of a failure decides how close they must be, the replacement must match the original exactly, and the way the spare is kept and recorded decides whether it still works when it is needed.

The flowchart only narrows the choice. The final list is agreed against the airport’s maintenance programme for quantity, stock location and restoration time, and against the manufacturer’s data for type, rating, connectors and seals.

QuantityFrom failures and restoration time
CriticalParts that darken a circuit
MatchSame type, rating, connectors
RecordsRegister, test results, warranty
ReferenceICAO Annex 14 Vol I Ch 10 · ICAO Doc 9137 Pt 9 · FAA AC 150/5340-26 · manufacturer data
Simplified selection guide, not a stocking plan. Quantities are not given because they depend on the site’s failure history, the MTBF data, how fast a part must be replaced and the airport’s maintenance programme. Isolate the CCR, lock out, prove the circuit dead and earth it as the site’s electrical safety procedure requires before fitting any spare.
Entry 20 · Approach-light selection Entry 22 · Replacement selection

Frequently Asked Questions

Q1How are AGL spare parts selected?

By working through a few decisions in order: how often the part is likely to fail, what its failure puts out, what the replacement must match, and how the spare will be kept and recorded. The result is then agreed with the airport’s maintenance programme and the manufacturer’s data.

Q2How many spares should be held?

There is no single figure. The number comes from how many failures to expect, which is the total operating hours of all the units in service divided by the MTBF (for lamps, the rated life is used instead), from the site’s own failure history, and from how fast a replacement must be fitted. Remember that MTBF is an average over many items and not a promise about any one.

Q3Why do critical parts need spares on site?

Availability counts how long a failure lasts as well as how often it happens. A part whose failure darkens a whole circuit, such as a CCR or a primary connector, costs far more per hour than one that darkens a single light, so the replacement must be close at hand and quick to fit.

Q4Why must a spare match the original?

A different lamp type or wattage changes the output and the load on the isolating transformer. A replacement transformer needs the same current ratio, a suitable power rating and compatible connectors. An LED module, its optics and its driver are matched, so only the approved part is fitted.

Q5What should be checked before the choice is final?

That each spare matches the type, rating, connectors and seals of the part it replaces, that the quantity suits the failure history and the restoration time, that it will be stored clean, dry and identified within any shelf life, and that the asset register and warranty records are kept up to date. The manufacturer’s data decides.

Precision AGL Academy

See It. Understand It. Then Learn How to Engineer It.

Recognising an AGL system visually is the first step. The next step is knowing how to design, install, test, commission and maintain them correctly.

Build Practical AGL Engineering Skills

Go deeper with structured training from Precision AGL Academy, covering:

AGL Fundamentals Design & Electrical Engineering Approach Lighting Photometry Installation & Commissioning Maintenance & Troubleshooting

Learn how each light, sign and circuit works as part of a complete airport lighting system, not just as an isolated diagram.

See. Understand. Apply. Engineer.