Junction Pit
Underground access for larger cable junctions and field electrical connections.
View DetailsAccessible underground cable-routing and maintenance points
Handholes support organised cable management and provide practical access for inspection, cable jointing, testing and maintenance without requiring extensive excavation of the surrounding airfield infrastructure.
Handholes provide accessible underground cable-routing and maintenance points within an airfield lighting installation.
They support organised cable management and provide practical access for inspection, cable jointing, testing and maintenance without requiring extensive excavation of the surrounding airfield infrastructure.
| Parameter | Specification |
|---|---|
| Handhole Dimensions | Project and cable-routing dependent |
| Construction | Durable construction suitable for underground installation |
| Cover Loading | Selected according to installation location and applicable loading requirements |
| Cable Entry | Configurable for ducts, conduits and direct cable routing |
| Drainage | Drainage arrangement selected according to site conditions |
| Installation Depth | Determined by cable routing, duct arrangement and site requirements |
| Cable Capacity | Selected according to the number and size of cables |
| Access Cover | Removable cover for inspection and maintenance access |
| Installation | Installed to suit airfield pavement, verge or underground service conditions |
The handhole provides a protected underground space for airfield lighting cables and associated connections. Construction should be selected to withstand the environmental and mechanical conditions at the installation location.
The overall configuration can be adapted to accommodate cable quantity, routing direction, available installation space and access requirements.
Cable entries are arranged to provide controlled routing into and out of the handhole. The configuration may include multiple cable or duct entries where circuits branch or change direction.
Proper routing should maintain suitable bend radii and prevent excessive mechanical stress on primary and secondary cables.
Unused entries should be sealed or protected as required by the installation design.
The cover is an important part of the installation, particularly where the unit is located near aircraft movement areas, vehicle routes or other trafficked surfaces.
Cover loading should be selected according to the installation location and applicable project requirements. A cover in an area trafficked by aircraft must carry the design aircraft wheel loading and sit flush with the surrounding pavement. State the load class on the order (for example EN 124 classes, where Class F 900 is intended for aircraft pavements, or the applicable Indian Standard) and confirm it against the design aircraft load.
In the runway strip and other graded areas the cover must be flush with the surrounding grade so it does not become an obstacle.
The cover should provide secure access while maintaining the required mechanical protection for the underground cable infrastructure.
Drainage should prevent the accumulation of standing water within the handhole. The appropriate arrangement depends on the surrounding ground conditions, water table, pavement construction and site drainage system.
Where required, drainage may be coordinated with the surrounding sub-base or a dedicated drainage arrangement to maintain a suitable environment for cable inspection and maintenance.
Handholes provide convenient access where cables require inspection, testing, jointing or future replacement. Maintaining sufficient internal working space is important where connections or joints are located within the handhole.
The final dimensions should consider not only cable capacity but also the access required for installation and maintenance personnel.
Handholes should be installed to maintain the intended cable route.
Installation details should be coordinated with the surrounding pavement, cable duct and airfield electrical infrastructure.
Handholes can be integrated with underground cable duct systems to provide accessible points along longer cable routes.
Duct entries should be aligned with the handhole and securely terminated to prevent damage to cables during installation or subsequent maintenance.
The transition between ducted and handhole cable routing should maintain suitable mechanical protection and cable support.
Any cable joints or electrical connections within the handhole should be inspected and tested in accordance with the applicable project commissioning procedure.
Handholes can be used when upgrading or rehabilitating existing airfield lighting cable networks. Replacement configurations can be selected for revised cable quantities, new duct routes or changes to the electrical distribution arrangement.
Where an existing handhole is being replaced, the surrounding pavement, drainage and cable infrastructure should be assessed to determine the appropriate replacement configuration.
WARNING — never open a live series circuit. An open series circuit driven by a constant-current regulator can produce dangerously high voltage. Opening, cutting or disconnecting any part of an energised circuit can cause serious injury or death and damage equipment.
Handhole selection and installation should be coordinated with the applicable airfield lighting design requirements, electrical installation practices, pavement loading requirements and local project specifications.
Dimensions, materials, cover loading, drainage and cable-entry arrangements should be confirmed against the requirements of the specific installation before procurement.
A handhole is an accessible underground cable-routing and maintenance point within an airfield lighting installation. It supports organised cable management and gives practical access for inspection, cable jointing, testing and maintenance without extensive excavation of the surrounding airfield infrastructure.
Typical locations are cable crossings and route transitions, branch cable routes and circuit distribution points, maintenance and inspection locations, cable jointing and connection points, interfaces between cable ducts, conduits and field equipment, and any location that needs an accessible underground service point.
Cover loading is selected according to the installation location and the applicable loading requirements. A cover in an area trafficked by aircraft must carry the design aircraft wheel loading and sit flush with the surrounding pavement. State the load class on the order (for example EN 124 classes, where Class F 900 is intended for aircraft pavements, or the applicable Indian Standard) and confirm it against the design aircraft load. In the runway strip and other graded areas the cover must be flush with the surrounding grade so it does not become an obstacle.
Handhole dimensions are project and cable-routing dependent, and installation depth is determined by the cable routing, duct arrangement and site requirements. Cable capacity is selected according to the number and size of cables. Final dimensions should consider not only cable capacity but also the access needed by installation and maintenance personnel, with enough internal working space where joints or connections sit inside the handhole.
Cable entries are arranged for controlled routing into and out of the handhole, and may include multiple cable or duct entries where circuits branch or change direction. Routing should maintain suitable bend radii and prevent excessive mechanical stress on primary and secondary cables. Unused entries should be sealed or protected as required by the installation design.
Handholes can be integrated with underground cable duct systems to provide accessible points along longer cable routes. Duct entries should be aligned with the handhole and securely terminated to prevent damage to cables during installation or later maintenance, and the transition should maintain suitable mechanical protection and cable support.
Drainage should prevent standing water accumulating inside the handhole. The right arrangement depends on the ground conditions, water table, pavement construction and site drainage system, and it may be coordinated with the surrounding sub-base or a dedicated drainage arrangement. Standing water is also a safety issue: wet joints and connectors raise the risk of insulation failure and shock, so water should be pumped out before work.
Check cover seating and accessibility, the cable and duct entry arrangement, cable routing and bend radius, secure cable positioning, drainage provisions, protection of cable joints and connectors, the finished level relative to the surrounding installation, and that cable and circuit identification labels are in place. Record the as-built position and level, and inspect and test any joints or connections inside the handhole under the project commissioning procedure.
Yes. Handholes can be used when upgrading or rehabilitating existing airfield lighting cable networks, with replacement configurations selected for revised cable quantities, new duct routes or changes to the electrical distribution arrangement. Where an existing handhole is being replaced, assess the surrounding pavement, drainage and cable infrastructure first to determine the right replacement configuration.
No. An open series circuit driven by a constant-current regulator can produce dangerously high voltage, and opening, cutting or disconnecting any part of an energised circuit can cause serious injury or death. De-energise the circuit at the regulator, apply the site lock-out / tag-out procedure, use the series circuit cut-out switch or an approved isolation device, and verify the circuit is de-energised before touching conductors, connectors or splices. See the electrical safety warning on this page.
Principal references are FAA AC 150/5370-10 (Item L-110 for underground electrical ducts and conduits and Item L-108 for underground cable for airports), FAA AC 150/5340-30J, ICAO Doc 9157 Aerodrome Design Manual Part 5 (Electrical Systems), and DGCA India CAR Section 4 with airport specifications. Selection and installation should also be coordinated with the airfield lighting design, pavement loading requirements and local project specifications.
Confirm the dimensions, materials, cover loading, drainage and cable-entry arrangements against the requirements of the specific installation before procurement. The cable quantity and size, routing directions, available installation space, access requirements, and the surrounding pavement, verge or underground service conditions all feed into the configuration.
Indian public tenders commonly ask for the documents below. State which ones your tender requires when you send the enquiry, so they are covered in the quotation.
Precision AGL Solutions can support selection of an AGL handhole configuration based on cable quantity, installation location, access requirements, loading conditions and drainage arrangements. Share these details, along with any existing handhole information, and we will help identify a suitable configuration.
Share your cable quantity, location, loading and drainage requirements for configuration support.
Product availability, configuration, dimensions, electrical characteristics, photometric performance, certifications and compliance status depend on the selected manufacturer and project specification. The technical values published on this page should not be treated as a substitute for the manufacturer's current approved Technical Data Sheet.
Final selection shall be based on the approved project specification, applicable aviation standards, authority requirements, manufacturer documentation and site conditions. Use of this page is also subject to the Legal Notice, Disclaimer & Terms of Use.
Standards and editions referenced on this site are listed on the Standards Reference page.