What are plug-in isolation transformers?

Series isolation transformers supplied with moulded plug-and-receptacle connectors on their leads, so they are fitted by plugging in rather than by making joints in the pit.

SAME TRANSFORMER, TWO WAYS TO CONNECT IT PLUG-IN · MOULDED CONNECTORS LOOP CABLE FROM CCR ON TO NEXT LIGHT TX PRIMARY PLUG PRIMARY PLUG SECONDARY PLUG TO FIXTURE FIXTURE SWAP = UNPLUG THREE, PLUG THREE FACTORY-MADE · KEYED · SEALED FIELD-JOINTED · JOINED IN THE PIT LOOP CABLE FROM CCR ON TO NEXT LIGHT TX FIELD JOINT FIELD JOINT FIELD JOINT TO FIXTURE FIXTURE SWAP = CUT, RE-JOINT AND SEAL THREE MADE ON SITE · QUALITY SET BY THE JOINT REPLACING A PLUG-IN UNIT · ON AN ISOLATED CIRCUIT ONLY ISOLATECCR OFF · LOCKED OFFPROVEN DEAD UNPLUGTHREE CONNECTORSLABEL THE LEADS SWAPSAME TYPE AND RATINGSEAT THE NEW UNIT PLUG INCLEAN · MATED · SEALEDMAKE EACH JOINT TESTELECTRICAL TESTSBEFORE ENERGISING PLUGS SPEED THE SWAP · BUT EVERY CONNECTOR STILL HAS TO BE CLEAN, FULLY MATED AND SEALED
plug-in connector
loop cable and field joint
The Fact FAA AC 150/5345-26 (L-823) · AC 150/5345-47 (transformers) · ICAO Doc 9157 Part 5

A plug-in isolation transformer arrives with its leads already ending in moulded plug-and-receptacle connectors. It is fitted by plugging into the loop cable and the fixture lead, not by cutting cable and making joints in the pit.

1The joints are made in the factory

The connector bodies, contacts and seals are moulded onto the leads under controlled conditions. That gives a consistent joint every time, without relying on a jointing kit used in a wet pit.

2A quicker, cleaner change

A unit with three connections, two on the primary and one on the secondary, can be changed by unplugging and plugging in rather than cutting and re-jointing. Less work in the pit helps, but only on a circuit that is isolated, locked off and proven dead first.

3The plugs become the joints to look after

The primary connector carries the full loop current, so a loose, corroded or wet plug can break the whole circuit. The secondary plug affects one fitting. Contacts must be clean and fully mated, and seals and boots intact. See Primary Connector and Secondary Connector.

4Match the whole unit

Plug-in describes how the unit connects, not what it does. A replacement must still have the same current ratio and a suitable wattage rating, and its connectors must be compatible with the cable and fixture leads already there.

PointPlug-in unitField-jointed unit
Connections madeFactory-moulded plugsJoints made on site
FittingPlug into loop cable and fixture leadCut, joint and seal in the pit
ReplacementUnplug, swap, plug inCut out, re-joint, re-seal
What to watchRight type, clean contacts, full mating, sealsQuality of every joint made
The drawing and table are generic. Real connectors differ in type, size and how they are moulded or fitted, and the number of connections depends on the unit. Never separate a primary or secondary connector on an energised circuit. Follow the manufacturer's data, the design drawings, the applicable specification and the airport's procedures.
Entry 15 · Transformer circuit position Entry 17 · Buried and elevated transformers

Frequently Asked Questions

Q1What is a plug-in isolation transformer?

It is a series isolation transformer supplied with its primary and secondary leads already terminated in moulded plug-and-receptacle connectors. It is fitted by plugging into the loop cable and the fixture lead, rather than by making joints in the pit.

Q2How is it different from a field-jointed transformer?

A field-jointed unit has bare or plain leads, and the joints to the primary cable and the fixture lead are made on site with a jointing kit. A plug-in unit moves most of that work to the factory, so there is less jointing to do in the pit.

Q3Can a plug-in transformer be unplugged while the circuit is energised?

No. The primary is part of the series loop, so opening a primary connector on a live circuit breaks the loop. Isolate the CCR, lock off, prove the circuit dead and make it safe before separating any connector.

Q4Is replacement faster with plug-in units?

Usually, because the joints are plugged rather than cut and re-made. The saving depends on the unit and the site, and the safety, testing and recording steps for a replacement are the same as for any transformer.

Q5Do plug-in transformers change the rating or ratio?

No. Plug-in describes how the unit connects, not what it does. The current ratio and wattage rating still come from the nameplate and must suit the circuit and the fixture.

Q6What should be checked on the connectors?

That the type matches, the contacts are clean and fully mated, and the seals and boots are in good condition. A loose, corroded or wet connector is a common cause of a dim fitting or a circuit fault, so the plugs need the same care as any joint.

Precision AGL Academy

See It. Understand It. Then Learn How to Engineer It.

Recognising an AGL system visually is the first step. The next step is knowing how to design, install, test, commission and maintain them correctly.

Build Practical AGL Engineering Skills

Go deeper with structured training from Precision AGL Academy, covering:

AGL Fundamentals Design & Electrical Engineering Approach Lighting Photometry Installation & Commissioning Maintenance & Troubleshooting