How is a transformer replaced?

The circuit is made safe, the right type and rating is chosen, the old unit comes out and the new one is fitted, and nothing is energised until insulation and continuity have been tested and the change recorded.

TRANSFORMER PIT LIGHT FITTING ISOLATION TRANSFORMER ISOLATED · DE-ENERGISED SERIES CIRCUIT ISOLATED · LOCKED OFF MAINTENANCE RECORD ISOLATE · LOCK OFF · PROVE DEAD SAME TYPE · SAME RATING LABEL · DISCONNECT · LIFT OUT FIT · CONNECT · SECURE INSULATION + CONTINUITY LIGHTS · RECORD STEP MAKE IT SAFE ILLUSTRATIVE · FOLLOW THE SITE PROCEDURE AND PERMIT

Swipe to see the full diagram

primary winding
secondary / task focus
series circuit
pit
The Fact Maintenance practice

Transformer replacement swaps a failed series isolation transformer for a new one. Because its primary is part of the series loop, the work starts by isolating the circuit, locking it off and proving it dead; a live loop must never be opened. The replacement must be the same type and rating: the same current ratio and a power rating that suits the fitting, with compatible leads and connectors.

The old unit is labelled, disconnected and lifted out, the new one is seated and its connectors made clean and dry, and before energising it is tested for insulation and continuity. After the circuit is released, check that the fitting lights and the CCR output and alarms are normal, then record the new unit, the date and the results. Steps and acceptance limits follow the site procedure and the manufacturer’s instructions.

Make It Safe
Isolate at the CCR, lock off, prove dead and earth as required. See Circuit Isolation.
Right Unit
Same current ratio, a suitable power rating and compatible connectors. A different rating changes the circuit load. See Circuit Load.
Remove and Fit
Label the leads, lift out the old unit, seat the new one and make the connectors correctly. See Transformer Connection and Transformer Pit.
Test, Restore and Record
Test before energising, check the circuit afterwards and update the record. See Transformer Testing and Transformer Maintenance.
Before workIsolated, locked off, proven dead
ReplacementSame type, ratio and suitable rating
Before energisingInsulation and continuity tested
ReferenceFAA AC 150/5340-26 · ICAO Doc 9157 Part 5 · ICAO Doc 9137 Part 9 · FAA AC 150/5345-47 (isolation transformers)
Generic sequence. The exact steps, permits, rating checks and acceptance limits depend on the transformer, the circuit and the airport’s procedures; follow the manufacturer’s instructions and the design drawings.
Entry 29 · Transformer maintenance Entry 31 · Transformer lifecycle

Frequently Asked Questions

Q1When is a transformer replaced?

When inspection or testing shows it no longer meets the specification, when it is physically damaged, or when faults keep recurring after the leads, connectors and pit have been put right. See Transformer Failure Modes and Transformer Maintenance.

Q2Can any transformer replace another?

No. The replacement must have the same current ratio and a power rating that suits the fitting, and it must be compatible with the existing leads and connectors. Follow the design drawings and the manufacturer’s data.

Q3Why must the circuit be isolated when only one fitting is affected?

Because the transformer’s primary is part of the series loop. Taking a transformer out opens the loop, and an open series circuit can drive the CCR output voltage dangerously high, and a live loop must never be opened. Isolate, lock off and prove dead first.

Q4Why test a new transformer before energising?

A new unit can be damaged in transit or handling, or a connector can be made wrongly. Insulation and continuity tests before re-energising find these faults safely, before they can cause an earth fault or an open circuit.

Q5What happens to the loop current after replacement?

The CCR still holds the same current. A replacement of a different power rating changes the circuit’s total load and voltage, so if the rating differs, check the load against the CCR rating.

Q6What should be recorded after a replacement?

The transformer’s identity and location, the date, the reason for replacement, and the test results. Keep the removed unit for examination if the cause of the fault is not yet known.

Precision AGL Academy

See It. Understand It. Then Learn How to Engineer It.

Recognising an AGL system visually is the first step. The next step is knowing how to design, install, test, commission and maintain them correctly.

Build Practical AGL Engineering Skills

Go deeper with structured training from Precision AGL Academy, covering:

AGL Fundamentals Design & Electrical Engineering Approach Lighting Photometry Installation & Commissioning Maintenance & Troubleshooting

Learn how each light, sign and circuit works as part of a complete airport lighting system, not just as an isolated diagram.

See. Understand. Apply. Engineer.