AGL Component Library By Precision AGL Academy

Step Switching Module

A critical control module that enables a Constant Current Regulator to output multiple discrete current levels, providing precise brightness control for AGL lighting systems across varying visibility conditions and operational requirements.

Step Switching Module

Image disclaimer: For identification and illustration only. It may show a product by another manufacturer and may not depict the exact item described; it is not a statement of any product’s quality, approval or performance. Third-party image and trademark rights belong to their owners. See full notice.

Overview

What Is It?

A Step Switching Module is an electronic or electromechanical sub-assembly used within Constant Current Regulators (CCRs) to provide discrete, selectable output current levels — commonly referred to as "steps." These steps correspond to specific brightness levels for AGL fixtures, allowing air traffic control or automated systems to adjust runway, taxiway, and approach lighting intensity based on prevailing visibility, time of day, and operational phase (takeoff, landing, or taxi).

The module receives a control signal (manual selector, ALCMS command, or remote I/O) and switches the CCR's output between predefined current setpoints — typically 2.8A, 3.4A, 4.1A, 5.2A, and 6.6A — to deliver the 5-step brightness control required by ICAO and FAA standards. Step Switching Modules can be implemented using thyristor/SCR banks, IGBT choppers, or multi-tap transformer switching, depending on the CCR topology.

Purpose

Purpose & Function

The step switching module exists because a single fixed light output can't serve every visibility condition an airfield faces: full intensity in clear daylight can be excessive and even glare-inducing, while the same intensity is barely adequate in fog, so ICAO and FAA standards mandate discrete, selectable brightness steps rather than a single fixed level. Its purpose is to translate a single control command — from a manual selector, ALCMS, or remote I/O — into the correct current setpoint reliably and repeatably, since every fixture on the series circuit depends on the same current level to maintain uniform brightness across the whole loop. Because different CCR topologies exist, the module's implementation varies (thyristor banks, IGBT choppers, transformer tap switching), but its purpose stays the same regardless: giving operators direct, standardized control over how bright the runway or taxiway lighting is at any given moment.

Application

Where Is It Used?

Step Switching Modules are integrated within CCRs installed in airfield electrical rooms, equipment shelters, or outdoor enclosures. They are used across all categories of AGL lighting systems, including:

  • Precision Approach Runways (CAT I, II, III): Enabling 5-step brightness control for edge lights, centreline lights, touchdown zone lights, and approach lighting systems.
  • Non-Precision Runways: Providing 3-step or 5-step control for edge and threshold lights.
  • Taxiway Lighting: Adjusting intensity of taxiway edge and centreline lights based on ground visibility and time of day.
  • Approach Lighting Systems (ALS): Controlling intensity of barrettes, crossbars, and sequenced flashing lights.
  • Obstruction and Beacon Systems: Regulating output levels for airport beacons and obstruction lights.

The module is a standard component of modern CCRs, whether ferroresonant, thyristor-based, or IGBT-based. It may also be retrofitted into older CCRs as part of a control system upgrade.

Placement

Installation & Location

The module is fitted inside the CCR cabinet it controls, mounted on a sub-panel or DIN rail alongside the power stage it drives, so it shares the regulator's enclosure, cooling, and earthing rather than having a location of its own. Its control input wiring (hardwired selector, 4-20mA, or Modbus RS-485/Ethernet) is brought into the CCR cabinet from the BCU, CCR Controller, or ALCMS, kept separate from the high-current power wiring inside the same enclosure. When supplied as a retrofit kit for an older CCR, it is installed in the space vacated by a manual tap-changer or relay bank during a control system upgrade, with the existing CCR's power components rewired to the module's outputs.

Function

How Does It Work?

The Step Switching Module operates by selecting one of several pre-defined current setpoints and driving the CCR's power stage to maintain that current in the series lighting circuit. The control signal can be manual (via a front-panel rotary switch), remote (via ALCMS or SCADA), or automated based on visibility sensor input.

In thyristor/SCR-based CCRs, the step switching module adjusts the firing angle of the SCRs to regulate the output current to the desired setpoint. In IGBT-based CCRs, it controls the duty cycle of the IGBT chopper circuit. In ferroresonant CCRs, the module switches taps on a multi-tap transformer to select the appropriate current level.

Typical current steps are standardized at:

  • Step 1 (Low): 2.8A — Minimum intensity, used for taxiway lighting in good visibility.
  • Step 2 (Medium-Low): 3.4A — Used for runway edge lights in daylight or moderate visibility.
  • Step 3 (Medium): 4.1A — Standard intensity for most runway lighting operations.
  • Step 4 (Medium-High): 5.2A — High intensity for low-visibility conditions.
  • Step 5 (High): 6.6A — Maximum intensity for CAT II/III operations and critical visibility conditions.
Architecture

System Architecture & Control Logic

MANUAL SELECTOR Front-Panel Rotary Switch ALCMS / SCADA COMMAND Modbus RS-485 / Ethernet/IP VISIBILITY SENSOR Automated Selection STEP SWITCHING MODULE Selects One of 5 Predefined Current Setpoints Switching Time: ≤50ms Electronic / ≤200ms Electromechanical SCR FIRING ANGLE Thyristor-Based CCRs IGBT PWM DUTY CYCLE IGBT-Based CCRs TRANSFORMER TAP SWITCHING Ferroresonant CCRs ↓ Same 5 setpoints, regardless of switching method ↓ 2.8A Step 1 — Taxiway, Good Vis. 3.4A Step 2 — Daylight / Moderate 4.1A Step 3 — Standard Ops. 5.2A Step 4 — Low Visibility 6.6A Step 5 — CAT II/III Critical
Three different switching technologies, one standardized 5-step ladder — the setpoints are fixed by ICAO/FAA, not by the CCR topology.
Construction

Physical Construction

As a sub-assembly rather than a standalone cabinet, the Step Switching Module is typically built on a mounting plate or sub-chassis sized to fit within the parent CCR's enclosure, alongside the transformer, bridge, or chopper circuitry it switches. Thyristor/SCR-based modules consist of a bank of SCRs and associated gate-drive and snubber circuitry mounted on a heatsink; IGBT chopper versions use a compact power module with its own heatsink and gate driver board; and multi-tap transformer switching versions use a bank of contactors or a motorised tap-changer mechanism mounted on an insulated frame. A dedicated control board decodes the step-select signal (from a selector switch, ALCMS command, or remote I/O) and drives the switching devices, with isolated interface circuitry protecting the low-voltage control side from the CCR's output. Terminal blocks for the control signal and, where the module is supplied as a field-replaceable unit, connectors for the power-side wiring, are provided for straightforward installation or exchange within the CCR cabinet.

Specification

Technical Parameters

ParameterTypical Value
Input Voltage230V / 400V AC (depending on CCR input)
Output Current Steps2.8A, 3.4A, 4.1A, 5.2A, 6.6A (5-step)
Step Switching MethodSCR firing angle control / IGBT PWM / Transformer tap switching
Control InterfaceHardwired selector, 4-20mA, Modbus RS485, Ethernet/IP
Switching TimeManufacturer-dependent, not set by a single mandated figure. Typically ≤ 50 ms for SCR/IGBT-based modules, up to a few hundred ms for contactor/tap-changer designs; confirm the specific product's rating against the project specification
Step AccuracyTypically within ±1–±3% of the setpoint current depending on manufacturer and topology; the CCR itself is commissioned and accepted against the tolerance in the project specification, not a single universal figure
Operating Temperature-20°C to +55°C (ambient)
Protection ClassIP20 (indoor) / IP65 (outdoor enclosure)
ApprovalsIEC 61822, FAA AC 150/5345-10
Power Supply

Electrical Requirements

RequirementTypical Value
Input Supply230V / 400V AC, taken from the host CCR's internal input/output bus
Control PowerLow-voltage DC supply (24V typical) for firing/switching logic and communication interface
Output CircuitSwitched constant-current series loop feed, floating from earth, interlocked with the CCR output stage
Interconnect CablingInternal panel wiring between module and CCR busbars, sized to full series current rating
Earthing/GroundingModule chassis and mounting plate bonded to the CCR cabinet earth bar
ProtectionFused/breaker-protected control supply; interlocked to prevent switching under load fault conditions
Insulation Resistance≥ 50 MΩ (megger test, output loop-to-earth)
Backup PowerControl supply typically riding on the CCR's own UPS/standby arrangement
Compliance

Applicable Standards

IEC 61822

Performance and safety requirements for AGL constant current regulators, including step switching accuracy and stability

FAA AC 150/5345-10

Specification for Constant Current Regulators used in AGL systems, covering step switching performance

ICAO Annex 14

Light intensity steps required for runway and approach lighting systems

FAA EB 67

Engineering Brief: Light Sources Other Than Incandescent and Xenon — the qualification route for LED fixtures on a stepped CCR circuit, covering compatibility with the standard 5-step current ladder

ICAO Doc 9157 Part 5

Aerodrome Design Manual, Electrical Systems — CCR and brightness-step control system design guidance

Note on figures: the values on this page are typical reference figures drawn from the standards listed above and from manufacturers’ published data. Switching time, step accuracy, and control interface options vary by manufacturer and CCR topology. Always design, install, commission and maintain to the project specification, the manufacturer’s manual and the standard in force at the aerodrome.

Prerequisites

Installation Requirements

Sub-Chassis Mounting within CCR Cabinet
Mechanical

Fit the module's mounting plate or sub-chassis into the parent CCR enclosure at the designed position, keeping it clear of the transformer, bridge, or chopper circuitry it switches.

Power-Side Wiring/Connector Mating
Electrical

Connect the power-side wiring or field-replaceable connectors between the module and the CCR's output stage, confirming correct polarity and secure contact.

Control Signal Termination
Electrical

Terminate the step-select signal wiring from the selector switch, ALCMS command, or remote I/O at the module's control terminal block.

Heatsink & Thermal Interface Check
Mechanical

Confirm the SCR bank or IGBT power module is seated flush on its heatsink with thermal compound applied, and that fixing screws are torqued evenly.

Isolation Verification
Electrical

Confirm the isolated interface circuitry between the low-voltage control side and the CCR's output is intact before the module is powered.

Communication/Address Configuration
Systems

Configure the module's Modbus or Ethernet/IP address where fitted, confirming it does not conflict with other devices on the CCR's control bus.

Pre-Energisation Sign-off
Documentation

Record connector mating, control wiring, and isolation checks as-built before the module is first energised within the CCR.

Verification

Testing & Commissioning

Contact Resistance Check
Pre-Energisation

Measure contact resistance across every step-selection contact or relay before energisation, ruling out high-resistance joints that would show up as an unstable step.

Step Transition Verification
Energisation

Command every possible step transition in turn and confirm the module switches cleanly to the correct tap or reference with no missed or intermediate steps.

Surge-Free Switching Test
Energisation

Monitor output current during a step change and confirm the transition happens without a current surge or momentary open circuit that could stress the series loop.

Output Current Accuracy Per Step
Energisation

Confirm the resulting output current at each step matches the CCR's rated value for that step within tolerance.

Arc Suppression / Contact Wear Check
Final Acceptance

Inspect switching contacts after repeated cycling for signs of arcing or wear, confirming any suppression network is functioning as designed.

Fail-to-Last-Step Verification
Final Acceptance

Interrupt the control signal mid-transition and confirm the module holds its last valid step rather than failing to an undefined or open state.

Documentation & As-Built Sign-off
Final Acceptance

Record contact resistance, transition, and surge test results in the commissioning dossier for handover.

Upkeep

Inspection & Maintenance

Contactor Contact Inspection
Annual

Inspect electromechanical contactors or relay banks for wear and arcing, since aged contacts cause erratic current selection or step failure.

Firing Angle Calibration
Annual

Calibrate SCR firing angle against a precision current meter, since component aging and temperature variation cause drift and inaccurate step output.

Communication Link Test
Semi-annual

Test digital communication with the ALCMS and confirm redundant paths are functional to prevent lost step-switching commands.

Transition Flicker Check
Annual

Verify soft-transition or slew-rate control is functioning so step changes don't produce visible flicker in LED fixtures.

Output Current Verification
Annual

Measure output current at each step against ICAO / FAA current-step tolerances using a calibrated meter.

Terminal & Enclosure Check
Annual

Re-torque terminal connections and inspect the enclosure for corrosion or moisture ingress.

Field Notes

Common Field Issues

Contact Wear in Electromechanical Switches

Older step switching modules using mechanical contactors or relay banks experience contact wear and arcing over time, leading to erratic current selection or step failure. Regular inspection and replacement of contactors is recommended, or upgrading to solid-state switching.

Firing Angle Drift in SCR-Based Modules

Over time, SCR firing angle calibration can drift due to component aging or temperature variations, resulting in inaccurate current output. Periodic calibration using a precision current meter is essential to maintain step accuracy.

Communication Loss with ALCMS

In smart CCRs with digital communication, step switching commands from ALCMS can be lost due to network interruptions or protocol mismatches. Installation of redundant communication paths and proper network diagnostics is recommended.

Step Transition Flicker

Abrupt switching between current steps can cause visible flicker in LED fixtures. Modern step switching modules incorporate soft-transition or slew-rate control to minimize flicker. Ensure your module supports smooth transition if using LED fixtures.

Diagnostics

Troubleshooting Guide

Erratic Current Selection or Step Failure
Likely Cause
Contact wear and arcing in an electromechanical (contactor/relay-bank) step switching module, common with age.
Diagnostic Steps
Cycle through each current step while observing contactor operation for chatter, pitting, or failure to seat; check for a stuck or welded contact.
Corrective Action
Replace the worn contactor(s), or consider upgrading to solid-state switching if wear is recurring; confirm clean switching through a full step-change test.
Inaccurate Current Output at a Given Step
Likely Cause
Firing angle calibration in an SCR-based module has drifted due to component aging or temperature variation.
Diagnostic Steps
Measure actual output current at each step with a precision current meter and compare against the specified value for that step.
Corrective Action
Recalibrate the firing angle for the affected step(s) using a precision current meter, and re-verify all steps afterward.
Loss of Communication with the ALCMS
Likely Cause
Damaged or poorly terminated RS-485/Ethernet cabling, connector corrosion, or a network configuration mismatch (baud rate, parity, IP addressing) between the two devices.
Diagnostic Steps
Check cable continuity and shielding/grounding along the run; verify termination resistors are correctly placed; confirm both ends are configured with matching communication settings.
Corrective Action
Repair or replace the damaged cable section, correct the termination or configuration mismatch, and confirm stable communication over a sustained test period before returning to service.
Visible Flicker During Step Transitions
Likely Cause
Abrupt switching between current steps without soft-transition or slew-rate control is causing visible flicker in LED fixtures.
Diagnostic Steps
Observe fixture brightness during a commanded step change; check whether the module's soft-transition/slew-rate feature is enabled and correctly configured.
Corrective Action
Enable or configure the soft-transition/slew-rate control if supported, or upgrade to a module that supports smooth transitions for LED fixtures.
Reliability

Failure Modes & Root Causes

Contactor / Relay Contact Wear
High Severity
Root Cause
Mechanical and electrical wear on contactor or relay contacts from repeated step-change cycling over years of operation.
Effect
Erratic current selection or a step that fails to change reliably, sticking on the previously selected level.
Detection Method
Functional step-change test across all levels, and physical inspection of contactor/relay contacts during scheduled maintenance.
Step Selection Logic Fault
Medium Severity
Root Cause
A control board component failure, a corrupted configuration setting, or a latent firmware fault affecting the step-selection sequence.
Effect
Module selects an incorrect step relative to the command received, or fails to respond to a step-change command at all.
Detection Method
Command-versus-output verification test across the full step range, and configuration/firmware version check during maintenance.
Loss of Communication with the ALCMS
Medium Severity
Root Cause
Damaged or corroded communication cabling, a failed communication port, or electrical noise on a shared conduit run.
Effect
Module cannot receive step-change commands from the ALCMS, leaving it fixed on its last commanded level until restored.
Detection Method
Communication diagnostic/heartbeat check at the ALCMS, and continuity testing of the comms cable.
Inaccurate Current Output at a Given Step
Medium Severity
Root Cause
A drifted or degraded tap/resistor network, or a contactor contact with elevated resistance from wear or corrosion.
Effect
Output current at a given step falls outside the tolerance defined for that intensity level, even though the module reports normal operation.
Detection Method
Output current measurement at each step against the rated tolerance during scheduled photometric or electrical verification.
Visible Flicker During Step Transitions
Low Severity
Root Cause
A slow or non-simultaneous contactor transition between steps, momentarily interrupting or dipping the circuit current.
Effect
A brief visible flicker across the runway lighting circuit during a brightness step change, noticeable to pilots on approach.
Detection Method
Timed transition test with current waveform capture to measure the switch-over duration against the specified maximum.
Surge Damage to Control Electronics
Medium Severity
Root Cause
A lightning-induced transient or switching surge on the power or control wiring that exceeds the module's protection rating.
Effect
Damaged control board, erratic step selection, or complete failure to respond to commands.
Detection Method
Post-storm functional check, and inspection of onboard surge protection devices for visible damage.
Precautions

Safety & Operational Notes

Isolate the Parent CCR Before Internal Work
Electrical Safety

The module operates within the CCR's high-voltage output path; de-energise and lock out the parent CCR at its supply, and verify zero energy at the module's terminals before removing covers or handling internal wiring.

Arcing at Switching Contacts or Devices
Electrical Safety

Electromechanical step-switching contacts (or the semiconductor devices in an electronic module) can arc under load; never operate or interrupt the module while it is actively switching current, and confirm the parent CCR is fully de-energised first.

Hot Contacts and Components
Personnel Safety

Allow switching contacts, resistors, or semiconductor devices to cool before handling after active operation, particularly after sustained operation at a high brightness step.

ESD-Sensitive Control Electronics
Operational

Use anti-static precautions when handling the module's control-signal interface board, where fitted.

Airside Work Coordination
Operational

Servicing the module takes its parent CCR, and the circuit it feeds, out of service; coordinate with ATC and raise a NOTAM before isolation.

Restore to Compliant State
Compliance

Confirm every brightness step switches cleanly and delivers the correct current before closing out the work and returning the CCR to service.

Field Insight

Engineering & Expert Notes

A Surge-Free Switching Test Is the One Item Not to Skip
Testing

An abrupt step transition on a series lighting circuit can produce a voltage surge that stresses fixtures and connectors across the whole loop, which is exactly what the surge-free switching design is meant to prevent; verify this behaviour with an actual test rather than assuming a module that transitions steps correctly is automatically transitioning them smoothly.

Contact Resistance Rises Before Transitions Become Visibly Unreliable
Reliability

On electromechanical step-switching hardware, rising contact resistance from accumulated arc erosion shows up as a measurable trend well before it causes an actual missed or failed transition, so a contact resistance check that's only run after a reported fault has already missed months of warning. Trend contact resistance readings across services rather than treating each check as a standalone pass/fail.

Transition Flicker Is Easy to Dismiss as Cosmetic But Signals Real Wear
Diagnostics

A brief flicker during a step change is often written off as a minor annoyance, but it commonly indicates worn contacts, drifting firing-angle timing on an SCR-based module, or a control-signal issue that will eventually produce a harder fault. Investigate reported transition flicker as a genuine symptom rather than a cosmetic nuisance.

Fail-to-Last-Step Behaviour Needs Actual Verification, Not Assumption
Commissioning

The module's designed fail-safe of holding the last commanded step (rather than dropping to an unpredictable state) on a fault only matters if it actually works as specified, and this behaviour is straightforward to overlook during commissioning if the acceptance test focuses only on normal step-change function. Explicitly verify fail-to-last-step behaviour under a simulated fault condition before sign-off.

Firing Angle Drift Affects Output Accuracy Before It Affects Visible Transitions
Calibration

On SCR-based step-switching modules, gradual firing-angle drift can shift the actual output current at a given step away from its calibrated value while the step transitions themselves still look and feel normal to an operator. Recheck firing angle calibration against the specified output current per step on a schedule, not only when a transition problem is reported.

Heatsink Interface Quality Matters More Inside a Crowded CCR Cabinet
Installation

A step-switching module mounted as a sub-assembly inside a CCR cabinet shares the cabinet's overall thermal environment with other heat-generating components, so a marginal thermal interface here is more likely to cause a problem than the same interface on a standalone, well-ventilated unit. Give the heatsink and thermal interface check real attention at installation given the shared, more constrained thermal environment.

Quick Answers

Frequently Asked Questions

Short answers about the Step Switching Module: what it is, how it works, typical specifications, standards, maintenance and common faults.

Q1What is a Step Switching Module?

A Step Switching Module is an electronic or electromechanical sub-assembly used within Constant Current Regulators (CCRs) to provide discrete, selectable output current levels — commonly referred to as "steps." These steps correspond to specific brightness levels for AGL fixtures, allowing air traffic control or automated systems to adjust runway, taxiway, and approach lighting intensity based on prevailing visibility, time of day, and operational phase (takeoff, landing, or taxi).

Q2What is the purpose of a Step Switching Module?

The step switching module exists because a single fixed light output can't serve every visibility condition an airfield faces: full intensity in clear daylight can be excessive and even glare-inducing, while the same intensity is barely adequate in fog, so ICAO and FAA standards mandate discrete, selectable brightness steps rather than a single fixed level.

Q3Where is a Step Switching Module used and installed?

Step Switching Modules are integrated within CCRs installed in airfield electrical rooms, equipment shelters, or outdoor enclosures. They are used across all categories of AGL lighting systems, including: Precision Approach Runways (CAT I, II, III): Enabling 5-step brightness control for edge lights, centreline lights, touchdown zone lights, and approach lighting systems. Non-Precision Runways: Providing 3-step or 5-step control for edge and threshold lights. Taxiway Lighting: Adjusting intensity of taxiway edge and centreline lights based on ground visibility and time of day.

Q4How does a Step Switching Module work?

The Step Switching Module operates by selecting one of several pre-defined current setpoints and driving the CCR's power stage to maintain that current in the series lighting circuit. The control signal can be manual (via a front-panel rotary switch), remote (via ALCMS or SCADA), or automated based on visibility sensor input. In thyristor/SCR-based CCRs , the step switching module adjusts the firing angle of the SCRs to regulate the output current to the desired setpoint.

Q5What are the typical technical parameters of a Step Switching Module?

Typical values are — Input Voltage: 230V / 400V AC (depending on CCR input); Output Current Steps: 2.8A, 3.4A, 4.1A, 5.2A, 6.6A (5-step); Step Switching Method: SCR firing angle control / IGBT PWM / Transformer tap switching; Control Interface: Hardwired selector, 4-20mA, Modbus RS485, Ethernet/IP; Switching Time: Manufacturer-dependent, not set by a single mandated figure. Typically ≤ 50 ms for SCR/IGBT-based modules, up to a few hundred ms for contactor/tap-changer designs; confirm the specific product's rating against the project specification.

Q6What are the electrical requirements for a Step Switching Module?

Typical requirements are — Input Supply: 230V / 400V AC, taken from the host CCR's internal input/output bus; Control Power: Low-voltage DC supply (24V typical) for firing/switching logic and communication interface; Output Circuit: Switched constant-current series loop feed, floating from earth, interlocked with the CCR output stage; Interconnect Cabling: Internal panel wiring between module and CCR busbars, sized to full series current rating; Earthing/Grounding: Module chassis and mounting plate bonded to the CCR cabinet earth bar; Protection: Fused/breaker-protected control supply; interlocked to prevent switching under load fault conditions.

Q7Which standards apply to a Step Switching Module?

The main references are IEC 61822 — Performance and safety requirements for AGL constant current regulators, including step switching accuracy and stability; FAA AC 150/5345-10 — Specification for Constant Current Regulators used in AGL systems, covering step switching performance; ICAO Annex 14 — Light intensity steps required for runway and approach lighting systems; FAA EB 67 — Engineering Brief: Light Sources Other Than Incandescent and Xenon — the qualification route for LED fixtures on a stepped CCR circuit, covering compatibility with the standard 5-step current ladder; ICAO Doc 9157 Part 5 — Aerodrome Design Manual, Electrical Systems — CCR and brightness-step control system design guidance. Always verify the current edition and your aerodrome's approved requirements.

Q8How often should a Step Switching Module be inspected and maintained?

Typical maintenance tasks and intervals are: Contactor Contact Inspection (annual); Firing Angle Calibration (annual); Communication Link Test (semi-annual); Transition Flicker Check (annual); Output Current Verification (annual); Terminal & Enclosure Check (annual). Your airport's approved maintenance programme takes precedence.

Q9How do I troubleshoot common Step Switching Module faults?

Common symptoms covered are: Erratic Current Selection or Step Failure; Inaccurate Current Output at a Given Step; Loss of Communication with the ALCMS; Visible Flicker During Step Transitions. For example, for "Erratic Current Selection or Step Failure": Likely Cause: Contact wear and arcing in an electromechanical (contactor/relay-bank) step switching module, common with age. Diagnostic Steps: Cycle through each current step while observing contactor operation for chatter, pitting, or failure to seat; check for a stuck or welded contact. Corrective Action: Replace the worn contactor(s), or consider upgrading to solid-state switching if wear is recurring; confirm clean switching through a full step-change test.

Go Further

Go Beyond the Component. Understand the Complete AGL System.

You have explored the component. Now understand how it works within the complete Airfield Ground Lighting system.

Learn AGL from fundamentals to design, installation, testing, photometry, commissioning, maintenance and troubleshooting through structured technical training at Precision AGL Academy.

Build practical knowledge. Understand the circuit. Read the standards. Troubleshoot with confidence.

Your next step in AGL starts here.

The Learning Pathway
Learn Understand Design Test Maintain Document Apply Certify

Need expert guidance on step switching module selection or calibration?

Precision AGL Academy provides advice on step switching technology selection, retrofit planning, and performance verification for AGL CCR systems.