AGL Component Library By Precision AGL Academy

Elevated Isolating Transformer

A weatherproof isolating transformer designed for above‑ground mounting, typically on poles, masts, or dedicated support structures. Engineered to withstand exposure to wind, rain, UV radiation, and temperature extremes, it provides reliable galvanic isolation for AGL fixtures where direct burial or pit installation is not feasible.

Elevated Isolating Transformer

Image disclaimer: For identification and illustration only. It may show a product by another manufacturer and may not depict the exact item described; it is not a statement of any product’s quality, approval or performance. Third-party image and trademark rights belong to their owners. See full notice.

Overview

What Is It?

The Elevated Isolating Transformer is a specialised variant of the standard AGL isolating transformer, optimised for above‑ground installation. Unlike buried or pit‑mounted transformers, this unit is housed in a robust, weather‑resistant enclosure (typically IP65 or higher) and equipped with mounting brackets or flanges for attachment to poles, masts, or structural supports. It is commonly used in areas where soil conditions are unsuitable for burial, where access for maintenance is required, or where the transformer must be positioned near elevated light fixtures such as obstruction lights on masts or approach lighting structures.

The transformer provides the same essential galvanic isolation between the 6.6A (or 20A) primary series circuit and the secondary fixture circuit, ensuring safety and fault containment. It is available in a range of power ratings (15W to 100W) and secondary voltages, matching the requirements of most AGL fixtures. The elevated design simplifies inspection, testing, and replacement, as the transformer is readily accessible without excavation.

Purpose

Purpose & Function

The elevated isolating transformer exists for sites where burying a transformer isn't practical or safe — rocky or waterlogged ground, or locations like obstruction lights on masts and towers where the transformer needs to sit close to the fixture it feeds rather than at ground level. Without an above-ground option, these installations would either be compromised on isolation or forced into an impractical and expensive burial effort.

Mounting it above ground also directly supports maintainability: a technician can inspect, test, or swap the unit without excavation, which matters because a failed isolating transformer takes its fixture out of service, and every hour spent digging to reach it is an hour the light stays dark. Faster access means faster restoration of full lighting coverage.

Application

Where Is It Used?

The elevated isolating transformer is deployed in a variety of above‑ground scenarios, including:

  • Obstruction Lighting on Masts and Towers: Powering high‑intensity obstruction lights on communication towers, chimneys, or wind turbines, where the transformer is mounted on the structure itself.
  • Approach Lighting Structures: Supporting approach lighting systems (e.g., ALSF‑1, ALSF‑2) where transformers are mounted on the approach light stanchions or gantries.
  • Airport Beacons and Masts: Powering rotating beacons or heliport beacons mounted on tall masts, with the transformer located at the base or on the mast.
  • Apron and Gate Lighting: Where floodlights or guidance fixtures are mounted on poles, the transformer can be integrated into the pole base or mounted on the pole itself.
  • Areas with High Water Table or Rock: Where direct burial is impractical due to water logging or hard rock, elevated mounting provides a viable alternative.
  • Retrofit and Maintenance‑Friendly Installations: Replacing existing above‑ground transformers or upgrading systems to improve accessibility for maintenance crews.

The transformer is typically mounted using heavy‑duty brackets or clamps, with cable entries via weatherproof glands. It is designed to withstand wind loads, vibration, and temperature variations, with an operating temperature range of -40°C to +55°C.

Placement

Installation & Location

Rather than sitting in a below-grade pit, the elevated transformer is mounted above ground using heavy-duty brackets or clamps, typically at the base of a mast, stanchion, or pole, or partway up the structure near the fixture it feeds. Cable entries use weatherproof glands to keep the enclosure sealed against wind-driven rain, and the mounting position is chosen to keep the unit accessible for maintenance from a ladder or platform rather than requiring excavation. This above-ground placement is favoured on obstruction-lit masts, approach lighting gantries, and beacon towers, and in ground conditions — high water table, shallow rock, or heavy paving — where digging a pit is impractical.

Function

How Does It Work?

Electrically, the elevated isolating transformer operates identically to standard AGL transformers: the primary winding is connected in series with the constant‑current loop, and the secondary winding delivers the appropriate voltage to the fixture. The key differentiator lies in its mechanical design and environmental protection:

  • Weatherproof Enclosure: The transformer is housed in a sealed, corrosion‑resistant enclosure (typically aluminium or stainless steel) with gasketed covers and cable glands that maintain IP65 or IP66 protection against rain, dust, and UV exposure.
  • Mounting Provisions: Integrated brackets, flanges, or mounting holes allow secure attachment to poles, masts, or structural members using U‑bolts, clamps, or bolted connections.
  • Thermal Management: The enclosure is designed with heat dissipation features (e.g., fins, ventilation slots with filters) to prevent overheating in direct sunlight while maintaining IP rating.
  • Cable Entry: Primary and secondary cables enter through compression glands or cable connectors that maintain the enclosure's weatherproof seal while providing strain relief.
  • Earthing Provision: A dedicated earthing terminal (internal or external) ensures proper grounding of the transformer casing for lightning and fault protection.

The transformer is fully compatible with standard CCR dimming profiles and meets all applicable electrical and safety standards. Its elevated design does not compromise electrical performance; efficiency and regulation remain within the same tolerances as conventional transformers.

Architecture

System Architecture & Control Logic

The elevated enclosure changes the transformer's mechanical environment, not its place in the control chain. An Airfield Lighting Control and Monitoring System (ALCMS) selects the required brightness step based on prevailing RVR, ATC instruction, or pilot-controlled lighting input, and the CCR regulates the whole loop to the corresponding fixed current; the elevated transformer's primary winding carries that current exactly as a buried or handhole-mounted unit would, with no addressable identity of its own and no way to be commanded independently of the loop. Its above-ground mounting does offer one practical advantage during fault-finding: once the CCR's loop voltage monitoring flags a fault in the general area, an elevated unit's weatherproof enclosure can be visually inspected and its connections tested in place without excavation, which is why this variant is often specified on masts, gantries, or structures where field access is already straightforward.

Function

Above-Ground Installation Path

Primary Winding

Carries the 6.6A or 20A constant-current loop, identical to a pit-mounted unit

Weatherproof Enclosure (IP65 / IP66)

Sealed aluminium or stainless steel housing with gasketed covers

Mounting Provisions

Brackets and flanges secure the unit to poles, masts, or structural supports

Thermal Management

Fins and filtered vents dissipate heat without breaking the IP seal

Accessible Without Excavation — Inspection, Testing, and Replacement Happen at Height, Not in a Pit
Construction

Physical Construction

Unlike the buried variant, the elevated transformer is not the seal itself — its windings and core sit inside a weatherproof enclosure, typically powder-coated aluminium or 304/316 stainless steel, rated IP65 or IP66 rather than the fully potted IP68 of a direct-burial unit, because the enclosure is designed to be opened for inspection and connection testing rather than sealed permanently. Gasketed covers keep the interior dry, brackets, flanges, or U-bolts provide the mounting to a pole, mast, or structural support, and vents or fins allow the winding to dissipate heat without breaking the IP seal, which a fully potted unit does not need but a serviceable enclosure does. Complete units typically weigh 3.0–6.0 kg depending on power rating and enclosure material, and internal wiring terminates at accessible terminal blocks rather than sealed splice connectors, since the enclosure itself — not the connection — is what keeps moisture out.

Specification

Technical Parameters

ParameterTypical Value
Primary Current6.6A (nominal) — 5‑step dimming: 2.8A to 6.6A; also available in 20A versions
Rated Power Options15W, 25W, 45W, 65W, 100W (custom options up to 300W available)
Secondary Voltage (at rated current)6.82V (45W), 9.85V (65W), 15.15V (100W) — custom voltages available
Frequency50/60 Hz
Insulation ClassClass F (155°C) or Class H (180°C) depending on rating
Enclosure MaterialAluminium (powder‑coated) or stainless steel (304/316)
Protection Class (enclosure)IP65 (dust‑tight, water‑jet protected) / IP66 (heavy rain)
Mounting TypeBracket, flange, or U‑bolt (pole/clamp mounting)
Operating Temperature-40°C to +55°C (ambient)
WeightApprox. 3.0 – 6.0 kg (depending on power rating and enclosure)
StandardsIEC 61823, FAA AC 150/5345‑47, FAA AC 150/5345‑53
Power Supply

Electrical Requirements

RequirementTypical Value
Circuit TypeSeries airfield circuit, constant current (CCR fed)
Primary Loop Current6.6A (5-step: 2.8A / 3.4A / 4.1A / 5.2A / 6.6A) or 20A high-current loops
Cable TypeL-824 single-conductor, direct-burial or duct-routed, matched to loop voltage class
ConnectorL-823 primary connector, weatherproof splice at enclosure entry
Enclosure BondingMetallic enclosure (aluminium/stainless) bonded to earth independent of the isolated secondary
Insulation Resistance≥ 50 MΩ (megger test, cable-to-ground)
Earthing/GroundingBracket, pole, or clamp mounting hardware bonded to structure/earth grid
Fault ProtectionCCR-level ground fault and open-circuit detection on the primary loop
Power SourceCCR output, regulated per ICAO/FAA intensity step schedule
Compliance

Applicable Standards

IEC 61823

AGL series transformers - characteristics for 6.6A series-circuit isolating transformers

FAA AC 150/5345‑47

Specification for Series to Series Isolation Transformers for Airport Lighting Systems (L‑830/L‑831 types, elevated variants)

FAA AC 150/5345‑53

Airport Lighting Equipment Certification Program (ALECP) — qualification listing

ICAO Annex 14

General requirements for AGL series circuit components

Prerequisites

Installation Requirements

Bracket or Clamp Fixing
Mechanical

Mount the transformer above ground using heavy-duty brackets or clamps at the base of a mast, stanchion, or pole, or partway up the structure near the fixture it feeds, torqued to the fixing manufacturer's spec.

Maintenance Access Position
Mechanical

Choose the mounting height and position so the unit remains accessible for maintenance from a ladder or platform, rather than requiring excavation.

Weatherproof Cable Entry
Electrical

Route primary and secondary cables through weatherproof glands to keep the enclosure sealed against wind-driven rain.

Primary & Secondary Termination
Electrical

Terminate the primary connection into the series loop and the secondary to the fixture, confirming both glanded entries are fully sealed.

Rating Match to Fixture & Loop
Electrical

Confirm the transformer's wattage and primary current match the fixture demand and the series circuit before connection.

Structure Suitability Check
Civil

Confirm the mast, stanchion, pole, or gantry the unit mounts to is rated for the added weight and wind loading, and that ground conditions (high water table, shallow rock, or heavy paving) justify the above-ground placement over a pit.

Position Recording
Documentation

Record the transformer's mounting position and structure reference against the site survey.

Pre-Energisation Sign-off
Documentation

Record fixing torque, cable entry seal, and rating as-built before the structure is closed out or handed over.

Verification

Testing & Commissioning

Insulation Resistance (Megger) Test
Pre-Energisation

Megger-test primary and secondary windings against earth and against each other before energisation, confirming insulation resistance clears the acceptable minimum.

Dielectric (Hi-Pot) Withstand Test
Pre-Energisation

Apply the rated dielectric test voltage between windings and earth to confirm the transformer withstands its rated withstand voltage without breakdown.

Loop Continuity Test
Pre-Energisation

Verify series loop continuity through the transformer's primary winding and confirm no unintended breaks exist before the circuit is first energised.

Enclosure Ingress Protection Check
Pre-Energisation

Inspect enclosure gaskets, cable glands, and drain points to confirm the rated IP65/IP66 protection is intact before the unit is closed up and mounted.

Mounting Bracket & Fastener Torque Check
Installation

Verify bracket, flange, or U-bolt mounting is torqued to spec and that the enclosure is secure against vibration and wind loading at its elevated position.

Secondary Voltage Verification
Energisation

With the CCR energised, confirm secondary voltage at the connector matches the transformer's rated ratio for the connected fixture load.

Corrosion Protection Check
Final Acceptance

Confirm the aluminium or stainless enclosure finish is free of coating damage or exposed metal that could initiate corrosion in an exposed elevated location.

Documentation & As-Built Sign-off
Final Acceptance

Record insulation resistance, dielectric, secondary voltage, and mounting torque readings alongside as-built position in the commissioning dossier for handover.

Upkeep

Inspection & Maintenance

Insulation Resistance (Megger) Test
Annual

Megger-test primary-to-secondary and primary-to-earth insulation to confirm it stays comfortably above minimum, flagging moisture ingress before it causes a series-circuit fault.

Enclosure Seal & Gasket Inspection
Annual

Check enclosure door seals and gaskets for cracking or compression set and re-torque fasteners to keep the IP65/IP66 rating intact against wind-driven rain.

Mounting Bracket & Fastener Check
Annual

Inspect the bracket, flange, or U-bolt mounting for corrosion, loosening, or fatigue from vibration and wind loading at height.

Enclosure Corrosion Inspection
Annual

Check the aluminium or stainless steel enclosure finish for corrosion, coating breakdown, or impact damage that could compromise weatherproofing.

Thermal Imaging Scan
Annual

Scan the transformer under normal load for abnormal hotspots, which often indicate a winding fault before it causes an outright failure.

Cable & Connector Inspection
Annual

Examine primary and secondary cable connections for corrosion or loose crimps, a common source of intermittent series-circuit faults.

Secondary Voltage Verification
Semi-annual

Measure secondary output voltage at rated current and confirm it matches the transformer's rated value for the connected fixture.

Load Current Verification
Semi-annual

Confirm primary current draw tracks the CCR's commanded intensity step correctly across the dimming range.

Field Notes

Common Field Issues

Enclosure Corrosion & UV Degradation

Elevated transformers are exposed to weather, UV radiation, and salt spray (in coastal areas). Aluminium enclosures can corrode if not properly coated, and plastic components can degrade. Regular inspection of the enclosure and touch‑up of paint/powder coating is recommended.

Moisture Ingress via Cable Glands

Over time, cable glands can loosen or the sealing rings can harden, allowing water to enter. Ensure glands are correctly torqued and use silicone grease on seals. Periodically check for moisture inside the enclosure and replace desiccant packs if used.

Overheating in Direct Sunlight

In hot climates, direct sun exposure can raise the internal temperature beyond the transformer's rating, leading to insulation degradation. Consider using sun shields, choosing lighter enclosure colours, or ensuring adequate ventilation.

Vibration and Mounting Fatigue

Mounting on tall structures can subject the transformer to wind‑induced vibration. Use anti‑vibration mounts, ensure all bolts are securely tightened, and periodically check for signs of fatigue or loosening.

Incorrect Mounting Orientation

Some transformers require a specific orientation for proper drainage of condensation. Ensure the enclosure is mounted with the cable entries facing downward or as per manufacturer's instructions to prevent water accumulation.

Birds and Insects

Openings (e.g., for ventilation) can become nests for birds or insects, blocking airflow and causing overheating. Use fine mesh screens or install protective covers where appropriate.

Diagnostics

Troubleshooting Guide

Enclosure Corrosion or Coating Failure
Likely Cause
Prolonged weather, UV, and (in coastal areas) salt spray exposure has degraded the enclosure's protective coating, allowing corrosion to begin.
Diagnostic Steps
Visually inspect the enclosure for corrosion, coating breakdown, or chalking; check mounting hardware for corrosion as well.
Corrective Action
Touch up or recoat the enclosure per manufacturer specification, or replace the enclosure if corrosion has progressed beyond surface level.
CCR Trips on Overcurrent or Ground Fault
Likely Cause
Loosened cable glands or hardened sealing rings have allowed moisture to enter the enclosure, degrading insulation resistance.
Diagnostic Steps
Megger the transformer (target ≥ 2 MΩ at 500V); check cable glands for correct torque and check for signs of moisture inside the enclosure.
Corrective Action
Re-torque or replace cable glands with silicone grease on the seals, dry out or replace the transformer if insulation resistance is below minimum, and replace any desiccant packs in use.
Overheating in Direct Sunlight
Likely Cause
Direct sun exposure in hot climates is raising the internal enclosure temperature beyond the transformer's rating, accelerating insulation degradation.
Diagnostic Steps
If accessible, check internal enclosure temperature against manufacturer limits during peak sun exposure; note the enclosure's colour and any existing shading.
Corrective Action
Fit a sun shield, consider a lighter enclosure colour on repainting, or improve ventilation to keep internal temperature within rating.
Vibration-Related Loosening or Fatigue
Likely Cause
Wind-induced vibration from mounting on a tall structure is loosening fasteners or fatiguing mounting brackets over time.
Diagnostic Steps
Check all mounting bolts for tightness; inspect brackets and anti-vibration mounts for cracking or wear.
Corrective Action
Re-torque fasteners to specification, fit anti-vibration mounts if not already present, and replace fatigued brackets.
Moisture Pooling Inside the Enclosure
Likely Cause
Incorrect mounting orientation is preventing condensation from draining, allowing moisture to accumulate inside.
Diagnostic Steps
Check the enclosure's orientation against manufacturer instructions — cable entries should typically face downward — and look for signs of standing moisture inside.
Corrective Action
Re-orient or re-mount the enclosure per manufacturer instructions so condensation drains away from internal components.
Airflow Blocked by Nesting or Debris
Likely Cause
Birds or insects have nested in ventilation openings, restricting airflow and contributing to overheating.
Diagnostic Steps
Inspect ventilation openings for nesting material, debris, or insect activity.
Corrective Action
Clear the blockage, and fit fine mesh screens or protective covers over ventilation openings to prevent recurrence.
Reliability

Failure Modes & Root Causes

Primary Winding Open Circuit
High Severity
Root Cause
Wire fatigue from repeated thermal cycling, a manufacturing defect in the winding, or a blown internal fuse-wire link from a lightning-induced transient.
Effect
Opens the series loop, darkening every fixture downstream of the transformer on that circuit.
Detection Method
CCR loop-continuity/open-circuit indication, and megger or continuity testing at the transformer primary.
Insulation Breakdown from Moisture Ingress
High Severity
Root Cause
Cracked or degraded encapsulation, a failed cable gland or seal, or prolonged submersion in a flooded handhole or pit.
Effect
Reduced insulation resistance leading to a partial or full ground fault that can trip the CCR.
Detection Method
Megger testing against the ≥2 MΩ minimum, and visual inspection of the encapsulation and cable entries.
Secondary Winding Short or Breakdown
High Severity
Root Cause
Internal insulation failure between secondary turns, often accelerated by sustained overtemperature operation.
Effect
Loss of secondary voltage regulation, fixture dimming or failure, and possible primary overcurrent.
Detection Method
Secondary voltage measurement under load, compared against the transformer's rated output.
Overload / Core Saturation from Rating Mismatch
Medium Severity
Root Cause
A CCR step or connected fixture load exceeding the transformer's rated primary current or secondary power.
Effect
Increased core losses, overheating, and accelerated insulation ageing.
Detection Method
Verification of the CCR step current against the transformer's rating plate, and thermal inspection where accessible.
L-823 Connector / Termination Corrosion
Medium Severity
Root Cause
Improper seating during installation, gasket failure allowing moisture in, or galvanic corrosion building up at the connector pins over time.
Effect
Intermittent contact, flicker, or a high-resistance joint that generates localised heat.
Detection Method
Visual inspection at scheduled maintenance, and continuity or resistance checks across the joint.
Encapsulation Cracking / Case Damage
Medium Severity
Root Cause
Freeze-thaw cycling, mechanical impact during installation or maintenance, or age-related degradation of the potting compound.
Effect
Exposes the winding to moisture, accelerating insulation breakdown.
Detection Method
Visual inspection during handhole or pit access, and a drop in insulation resistance on megger testing.
Thermal Degradation from Sustained Overcurrent
High Severity
Root Cause
Repeated or prolonged operation above rated current, often from an incorrectly set CCR step or a transformer undersized for the installed load.
Effect
Progressive insulation embrittlement that shortens service life and raises the risk of an eventual winding failure.
Detection Method
Rating verification against actual loop current, and insulation resistance trending across successive maintenance cycles.
Output Voltage Drift / Regulation Loss
Low Severity
Root Cause
Gradual winding degradation or core ageing that shifts the transformer's turns-ratio performance away from its original specification.
Effect
Fixture brightness drifts slightly from the intended intensity step without an outright fault.
Detection Method
Photometric intensity survey and secondary voltage measurement compared against commissioning records.
Weatherproof Housing Seal Failure
Medium Severity
Root Cause
UV degradation of enclosure gaskets, wind-induced vibration loosening mounting hardware on the pole or mast, or thermal cycling from direct sun exposure.
Effect
Moisture ingress into the enclosure and a loosened mounting that can shift the unit's aim or connections.
Detection Method
Visual inspection of housing seals, gaskets, and mounting hardware during scheduled elevated-structure maintenance.
Precautions

Safety & Operational Notes

Series Circuit Isolation
Electrical Safety

The elevated transformer sits on a constant-current series loop that can carry several kV. De-energise and lock out the CCR, then verify zero energy at the transformer before opening its housing or handling connectors.

Working at Height
Personnel Safety

Use appropriate fall protection, a stable platform or ladder, and secure footing when accessing a mast- or pole-mounted transformer, and never rely on the fixture housing or mounting bracket to bear body weight.

Frangibility Not to Be Defeated
Mechanical

Never substitute a frangible mount or coupling with a rigid fitting or over-torque it during installation or repair; the mount must still shear cleanly on aircraft impact to limit damage under the frangibility requirement.

Airside Work Coordination
Operational

Any work on or near an active runway or taxiway requires ATC/airside coordination and a NOTAM where the fixture will be dark or out of tolerance, with vehicle and personnel movement kept clear of the strip per the aerodrome's safety management procedures.

Insulation Test Before Re-Energisation
Electrical Safety

After any cable, connector, or transformer work, megger test the affected series loop before restoring power, since a residual fault at re-energisation can trip the CCR or damage healthy fixtures on the same circuit.

Hot Surface Contact
Personnel Safety

Allow the transformer case and adjacent fixture housing to cool before handling after an active period, since sustained loop current can leave exposed surfaces hot enough to burn.

PPE & Grounding
Personnel Safety

Use insulated tools and appropriate PPE when working on series-circuit connections, and confirm the mast, mount, and transformer case are bonded/grounded per the electrical design before reconnecting the loop.

Restore to Compliant State
Compliance

Do not leave a fixture out of aim tolerance, at reduced intensity, or otherwise non-compliant after maintenance; verify photometric and positional conformance before closing out the work and cancelling the associated NOTAM.

Field Insight

Engineering & Expert Notes

Working at Height Changes the Isolation Sequence
Personnel Safety

Confirm fall protection and access equipment are in place before starting any electrical isolation on an elevated unit — don't let the electrical lockout sequence take priority over securing safe access first.

Frangibility Still Applies to the Support Structure
Mechanical

Where the pole or mast itself sits within an obstacle-free area, confirm it and its mounting still meet frangibility requirements, not just the transformer housing.

UV and Weather Exposure Age the Housing Faster Than a Buried Equivalent
Durability

An elevated unit's weatherproof housing sees continuous UV and temperature cycling a buried unit never experiences. Inspect housing seal and material condition on a schedule that reflects that exposure.

Coordinate Access Timing With Airside Operations
Operational

Because reaching an elevated unit often means a vehicle with a lift or platform near the movement area, plan the access window with airside coordination from the start, not as an afterthought once the crew arrives.

Direct Sun Exposure Can Push Case Temperature Higher Than a Shaded Buried Unit
Personnel Safety

Factor solar loading into any hot-surface handling precaution — an elevated unit in direct sun can run warmer to the touch than an equivalent buried unit at the same electrical load.

Check Mounting Hardware Condition Alongside Electrical Testing
Inspection

Corrosion or fatigue in the pole-mounting hardware is a mechanical risk independent of the transformer's electrical health. Check both during the same visit rather than treating them as separate inspection items.

Quick Answers

Frequently Asked Questions

Short answers about the elevated isolating transformer: what it is, how it works, specifications, standards, maintenance and common faults.

Q1What is an elevated isolating transformer?

It is a variant of the standard AGL isolating transformer optimised for above-ground installation. It is housed in a robust, weather-resistant enclosure, typically IP65 or higher, with mounting brackets or flanges for attachment to poles, masts or structures.

Q2What does it do electrically?

It works the same as a standard AGL transformer. Its primary winding is in series with the 6.6 A (or 20 A) constant-current loop and its secondary supplies the fixture, giving galvanic isolation for safety and fault containment.

Q3When is an elevated transformer used instead of a buried one?

Where soil conditions are unsuitable for burial, where maintenance access is needed, or where the transformer must sit near elevated fixtures. Typical uses are obstruction lights on masts, towers, chimneys and wind turbines, and approach lighting structures such as ALSF-1 and ALSF-2 stanchions.

Q4What power ratings and secondary voltages are available?

Ratings are 15 W, 25 W, 45 W, 65 W and 100 W, with custom options up to 300 W. Example secondary voltages at rated current are 6.82 V (45 W), 9.85 V (65 W) and 15.15 V (100 W), and custom voltages are available.

Q5What primary current does it use?

6.6 A nominal with 5-step dimming from 2.8 A to 6.6 A (2.8, 3.4, 4.1, 5.2 and 6.6 A), or 20 A versions for high-current loops.

Q6What is the enclosure made of and how is it protected?

Powder-coated aluminium or 304/316 stainless steel with gasketed covers and cable glands, rated IP65 or IP66. Mounting is by bracket, flange or U-bolt, and the operating range is -40°C to +55°C. Weight is roughly 3 kg to 6 kg.

Q7How is the enclosure earthed?

The metallic enclosure is bonded to earth independently of the isolated secondary, and the mounting hardware is bonded to the structure or earth grid. Primary connections use L-824 cable with L-823 connectors, and insulation resistance should be at least 50 MΩ.

Q8Which standards apply?

The main references are IEC 61823, FAA AC 150/5345-47 (series isolation transformers, L-830/L-831 types including elevated variants), FAA AC 150/5345-53 (ALECP certification) and ICAO Annex 14. Always verify the current edition and your aerodrome's approved requirements.

Q9How often should it be inspected?

Typical intervals are semi-annual for secondary voltage and load current verification, and annual for insulation resistance, enclosure seal and gasket, mounting bracket and fasteners, corrosion, thermal imaging and cable and connector inspection. Your airport's approved maintenance programme takes precedence.

Q10What are the common problems with elevated isolating transformers?

Common problems are enclosure corrosion and UV degradation, moisture ingress through cable glands, overheating in direct sunlight, vibration and mounting fatigue, incorrect mounting orientation, and birds and insects. Moisture pooling inside the enclosure or a CCR tripping on ground fault can point to seal failure.

Go Further

Go Beyond the Component. Understand the Complete AGL System.

You have explored the component. Now understand how it works within the complete Airfield Ground Lighting system.

Learn AGL from fundamentals to design, installation, testing, photometry, commissioning, maintenance and troubleshooting through structured technical training at Precision AGL Academy.

Build practical knowledge. Understand the circuit. Read the standards. Troubleshoot with confidence.

Your next step in AGL starts here.

The Learning Pathway
Learn Understand Design Test Maintain Document Apply Certify

Need expert guidance on elevated isolating transformers for your AGL project?

Precision AGL Academy provides advice on mounting options, weatherproofing, and selection of the right transformer for above‑ground installations.