Calculator #48

AGL Circuit Cable Drum Calculator

Turn a circuit route into an order: feeder and return cable, fixture slack, joints, wastage and the number of drums.

About this calculator

A series circuit runs out from the CCR and back to it, so the cable needed is more than the route length. Every fixture takes slack, every drum change or long pull adds a joint, and every drum leaves a few metres on the core. This tool builds the order length line by line, then finds how many drums of your chosen size cover it and how much is left over.

Quick start

Route

Rule note

CCR to the start of the lighting field. It is laid out and back, so it counts twice.

Rule note

Start to end of the fixtures along the outgoing cable.

Rule note

Each one takes slack for connectors and the transformer pit.

Allowances

Rule note

Cable drawn into the pit and left for re-termination.

Rule note

CCR end, both ends of the loop, including tails to the terminals.

Rule note

Bends, crossings, trench undulation and pit-to-pit offsets. Your own project figure.

Rule note

Cut-back and overlap at each straight joint.

Rule note

Longest length you will pull between pits or joint bays. Set 0 to ignore.

Drums & Supply

Rule note

Standard supplier length, such as 250, 500 or 1,000 m. The comparison table on the next tab compares all three.

Rule note

Left on the core and the inner end. Use the supplier figure.

Rule note

Each is costed on its own drums.

Rule note

From the data sheet. Set 0 to skip.

Rule note

Set 0 to skip.

FAQ

AGL Circuit Cable Drum Calculator: Frequently Asked Questions

Quick answers on how the cable order length, joints and number of drums are worked out.

What does the AGL Circuit Cable Drum Calculator do?

It turns a circuit route into a cable order. It builds the order length line by line from the feeder and return cable, fixture slack, termination allowance, routing allowance, joints and wastage, then finds how many drums of your chosen size cover it and how much is left over. It also compares 250 m, 500 m and 1,000 m drums and produces a PDF report.

How is the conductor length calculated?

The feeder is laid out and back, so Lbase = 2 × feeder + field + return. Slack at each fixture and the termination allowance are added, then a routing percentage covers bends, crossings, trench undulation and offsets: Lr = (Lbase + n × slack + terminations) × (1 + routing %).

How are joints and the order length determined?

Joints come from the drum count, or from the maximum pull if that needs more, so Joints = max(drums − 1, ⌈Lr ÷ max pull⌉ − 1). Each joint uses a little cable, so the two are solved together until the joint count stops changing. The order length is Lorder = (Lr + joints × per-joint) × (1 + wastage %).

How is the number of drums calculated?

Drums = ⌈Lorder ÷ (drum length − unusable)⌉, where the unusable cable per drum is the length left on the core and the inner end, from your supplier. Leftover is the usable cable on the drums less the order length, and utilisation is the order length divided by the drum length supplied. Drums for several circuits are counted per circuit, with the shared-offcut count shown for comparison.

Can you show a worked example?

With a 500 m feeder, a 2,400 m field route and the same return, the base length is 5,800 m. Adding 100 fixtures × 1.5 m plus 20 m (170 m) and 5 % routing gives 6,268.5 m. With 500 m drums, 5 m unusable, 13 joints at 1 m each and 3 % wastage, the order length is 6,469.9 m, which needs 14 drums, leaves 460.1 m and gives 92.4 % utilisation.

Are the allowances and drum lengths standard values?

No. The percentage allowances are project assumptions, and the slack, termination, per-joint and unusable cable values are your own figures. Drum lengths and unusable cable come from your supplier. The cable weight and price fields are optional and can be set to 0 to skip them.

What does the cable drum calculator not do?

It does not plan cut lengths between pits, pick drum lengths to match them, or allow for different cable types in one circuit. It assumes one continuous run per circuit with a straight joint at each drum change. Order against the final cable schedule and the supplier's available drum lengths.

More Tools

Related Knowledge Hub Resources

Talk to Precision AGL Academy

Follow the Academy

Drums required—