What is a PLC?

The programmable logic controller is the industrial computer that reads status, runs the control logic and switches the outputs that command the CCRs.

PLC · READ, DECIDE, ACTALCMS · HMIcommands outstatus and alarms inCCRs · FIELDcontactors, bus, I/Ostatus contacts backPLC · SCAN CYCLEINPUTSCCR statusalarms, switchesPROGRAMlogic, interlocksintensity stepsOUTPUTSrelay commandsbus commands1 READ2 RUN3 WRITE4 TALKREPEATS CONTINUOUSLYCMDSTATUSCMDSTATUSAIRFIELD LIGHTSLOGIC IN SOFTWAREchange the program,not the wiringSTATUS COMES BACKCCR contacts and busshow what really happenedFAILURE STATEoutputs go to defined states;local control at the CCR is the fallbackSCHEMATIC · NOT TO SCALE · SCAN TIME, I/O AND LOGIC ARE SET BY THE PROJECT DESIGN
command / logic
status back
failure state
The Fact Control logic

The PLC is the part of the control system that does the real-time thinking. It is a rugged industrial controller, usually in the substation or CCR room, that continuously reads inputs such as CCR status, alarms and switch positions, runs a stored program of logic, interlocks and intensity-step selection, and writes outputs that command the CCRs and other field equipment. It repeats this as a scan cycle: read, run, write, communicate.

The PLC sits between the ALCMS and HMI, which supervise and display, and the equipment, which it commands through relay outputs or a communication bus. Because the logic is held in software, it can be changed by editing and testing the program rather than rewiring, and the PLC reports status and diagnostics back up the chain. If the PLC or its link fails, outputs go to the defined states set by the design and local control at the CCR remains the fallback, so the screen can be out of date and the real status is checked in the field.

PurposeRun the control logic
InputsCCR status, alarms, switches
ProgramLogic, interlocks, steps
OutputsRelay and bus commands
CycleRead, run, write, communicate
LocationSubstation or CCR room
LinksUp to ALCMS, down to CCRs
ReferenceFAA AC 150/5345-56 (L-890 ALCMS); ICAO Doc 9157 Part 5 (electrical systems); IEC 61131 (programmable controllers); IEC 62443 (industrial network security); project design documents
Awareness schematic only, not an operating procedure. Hardware, scan time, I/O arrangement, program logic and failure states are set by the manufacturer, the project design and the airport’s own procedures. Only trained and authorised personnel work on a PLC or change its program, under change control.
Entry 7 · HMI Entry 9 · SCADA

Frequently Asked Questions

Q1What does PLC stand for and what does it do?

PLC means programmable logic controller. In an airfield lighting control system it is a rugged industrial controller that reads inputs such as CCR status and alarms, runs a stored program of logic, and switches outputs that command the CCRs and other equipment.

Q2How is a PLC different from the HMI?

The HMI is the screen people use to see status and send commands. The PLC does the real-time work behind it: it receives the command, applies the logic and interlocks in its program, and drives the equipment, then sends the resulting status back to be displayed.

Q3What is the scan cycle?

A PLC repeats a short loop continuously: read the inputs, run the program, write the outputs and handle communication. Because it repeats many times a second, the outputs follow changes in the inputs almost immediately. The actual scan time depends on the PLC and the project.

Q4Why use a PLC instead of hard-wired relays?

A PLC holds the logic in software, so interlocks, sequences and intensity-step selection can be changed by editing and testing the program rather than rewiring. It also gives diagnostics and a status record. Hard-wired circuits are still used wherever the design requires them.

Q5What happens if the PLC or its link fails?

That depends on the design. Outputs are normally set to defined states on a failure, a watchdog can flag a stopped program, and local control at the CCR remains the fallback. The screen can be out of date, so check the real status at the CCR or in the field and follow the failure flow.

Q6Can the PLC program be changed on site?

Only by authorised, trained personnel under the airport's change-control procedure. Changes are tested, a backup of the working program is kept, and the lights are verified afterwards, because the program decides how lighting that pilots rely on is commanded.

Precision AGL Academy

See It. Understand It. Then Learn How to Engineer It.

Recognising an AGL system visually is the first step. The next step is knowing how to design, install, test, commission and maintain them correctly.

Build Practical AGL Engineering Skills

Go deeper with structured training from Precision AGL Academy, covering:

AGL Fundamentals Design & Electrical Engineering Approach Lighting Photometry Installation & Commissioning Maintenance & Troubleshooting

Learn how each light, sign and circuit works as part of a complete airport lighting system, not just as an isolated diagram.

See. Understand. Apply. Engineer.