What is a ceilometer?

The instrument that looks straight up and times a pulse of laser light to find the base of the cloud — cloud height, cloud layers and vertical visibility — and how that ceiling reading is used for approach and low-visibility operations.

HOW IT MEASURES timed pulse of light WHAT IT REPORTS up to three cloud layers WHERE IT SITS runway approach, plan view H cloud base droplets scatter light back pulse up echo down ceilometer H = speed of light × time ÷ 2 laser pulse, timed echo LAYER 1 FEW LAYER 2 BKN LAYER 3 OVC ceilometer cloud height and amount per layer VV reported if the sky is obscured CEILOMETER ILS MM SITE RUNWAY LANDING DIRECTION on the approach path, near the middle-marker site or equivalent SIGNAL CHAIN Ceilometer head Surge protection + junction box Ceilometer processor / AWOS ATC · AWOS display + LVP procedures
laser pulse and landing direction
echo and cloud-base height
signal flow to the users
The Fact ICAO Annex 3 · WMO-No. 8

A ceilometer measures the height of the cloud base above the aerodrome. A laser fires short pulses of infrared light straight up, cloud droplets scatter some of it back, and the instrument times the echo. Height = speed of light × round-trip time ÷ 2.

It reports up to three cloud layers with their amount (few, scattered, broken, overcast) and, when fog or heavy precipitation hides the sky, the vertical visibility. The base of the lowest layer below 6,000 m (20,000 ft) covering more than half the sky is the ceiling, one of the values that decide whether approach minima are met.

A ceilometer is not a visibility sensor: it looks up, not along the runway, and it says nothing about MOR or RVR. A dirty, wet or frosted window can report false low cloud or hide real cloud, so the optics are part of the measurement. The visibility sensor is entry 11; the RVR sensor is entry 13.

ReportsCloud base height, up to 3 layers, vertical visibility
MethodPulsed laser (lidar), time of flight of the echo
BeamVertical and narrow; eye-safe class set by the manufacturer
RangeSeveral km; commonly up to about 7.6 km (25 000 ft); some units reach further
CeilingLowest layer below 6 000 m (20 000 ft) covering more than half the sky, or VV
Position (Annex 3)At or near the ILS middle-marker site (about 900 to 1 200 m from the threshold) for approach and landing
MountingLevel, clear sky path; frangible where in protected areas
OpticsWindow heater or blower; regular cleaning and check
Schematic; not to scale. Siting, number of sensors, averaging, calibration interval and operating limits follow the meteorological authority, the current ICAO Annex 3, WMO-No. 8 and the manufacturer’s instructions.
Cloud base
Height above ground of the lowest cloud the laser can see.
Ceiling
Lowest layer covering more than half the sky; sets approach minima.
Vertical visibility
Reported as VV when fog or precipitation hides the sky.
Not a visibility sensor
That is entry 11: it measures horizontal MOR, not cloud height.
Entry 11 · Visibility sensor Entry 13 · RVR sensor

Frequently Asked Questions

Q1What does a ceilometer measure?

It measures the height of the base of the clouds above the aerodrome. Most modern units report up to three cloud layers with their amount, and report vertical visibility when fog, heavy rain or snow hides the sky. The height of the lowest layer covering more than half the sky is the ceiling, which is one of the values used to decide whether approach minima are met.

Q2How does a laser ceilometer work?

It sends very short pulses of infrared laser light straight up. Cloud droplets scatter a little of that light back to a receiver beside the transmitter. The instrument times the echo, and the height is the speed of light multiplied by the round-trip time, divided by two. Software then processes many pulses to pick out the cloud layers and ignore rain, haze and noise.

Q3What is vertical visibility?

When fog, heavy precipitation or blowing snow hides the sky, there is no clear cloud base to measure. The ceilometer then reports the vertical visibility: how far up an observer could see into the obscuring layer. It is reported as VV in a METAR, and it counts as the ceiling in that situation.

Q4Is a ceilometer the same as a visibility sensor?

No. A ceilometer looks straight up and reports cloud height. A visibility sensor looks sideways through the air and reports the meteorological optical range, which is the input to RVR. Fog can make horizontal visibility very poor while the ceilometer reports a very low vertical visibility, so the two instruments are used together in low-visibility operations. See entry 11 for the visibility sensor; the RVR sensor is entry 13.

Q5Where is a ceilometer placed?

For approach and landing, ICAO Annex 3 guidance places the cloud-height sensor at the ILS middle-marker site (roughly 900 to 1,200 m before the threshold) or an equivalent position on the approach path, where the cloud that matters to an arriving aircraft is. The meteorological authority decides the number and positions. The mounting must stay clear of the runway protected areas or be frangible, and the vertical beam needs a clear path.

Q6How does it connect to the AGL system?

It is a separate meteorological system and not part of the series circuit, but it shares the airfield. It needs power, earthing and surge protection, and its cable needs recording and protection like any other airfield cable. Its output goes to the AWOS, the ATC display and the low-visibility procedures; at some aerodromes ceiling and visibility together trigger those procedures and the related lighting settings, but practice varies, so follow the aerodrome's procedures.

Q7What goes wrong, and is it safe to work on?

Typical faults are a dirty, wet or frosted window, bird droppings, insects or debris on the optics, a blocked blower or failed heater, laser ageing and a unit that is no longer level. A contaminated window can report false low cloud or miss real cloud. Ceilometer lasers are normally eye-safe, but do not look into the beam through binoculars or other optics, and follow the manufacturer's laser-safety instructions. Work near the approach path needs the permit-to-work and aircraft-movement controls, and because the ceiling affects approach minima, tell ATC and the meteorological authority before taking a sensor out of service.

Precision AGL Academy

See It. Understand It. Then Learn How to Engineer It.

Recognising an AGL system visually is the first step. The next step is knowing how to design, install, test, commission and maintain them correctly.

Build Practical AGL Engineering Skills

Go deeper with structured training from Precision AGL Academy, covering:

AGL Fundamentals Design & Electrical Engineering Approach Lighting Photometry Installation & Commissioning Maintenance & Troubleshooting

Learn how each light, sign and circuit works as part of a complete airport lighting system, not just as an isolated diagram.

See. Understand. Apply. Engineer.