What is cable identification?

How every AGL cable is made recognisable — durable tags, route markers and matching as-builts — so the circuit you are about to work on is the circuit you meant.

IN A HANDHOLE · SECTION look-alike cables, told apart by their tags ALONG THE ROUTE · PLAN references on site match the drawing HANDHOLE CKT 1CKT 2 CKT 1 1 2 3 HH-1 HH-2 MARKERMARKER AS-BUILT RECORD CKT 1 · HH-1 to HH-2 · joints and routes same references as the tags 2 4 5 1TAG ON EACH CABLEcircuit reference, durable and legible 2TAG IN EVERY HANDHOLEso look-alike cables can be told apart 3TAG AT EACH JOINTand at every termination 4ROUTE MARKERSshow where the buried cable runs 5AS-BUILT RECORDuses the same names as the tags IDENTIFIED CABLE RIGHT CIRCUIT, FIRST TIME Tag matches drawing, then isolate and prove dead UNIDENTIFIED CABLE WRONG CABLE, REAL RISK Look-alikes invite a wrong cut or live work SCHEMATIC · NOT TO SCALE · FOLLOW THE DESIGN DRAWINGS
AGL cable
cable tag and route marker
handholes
The Fact Series circuit design

Cable identification is how each AGL cable is made recognisable: a durable tag carrying the circuit reference at its ends, at joints and wherever it enters a handhole, route markers above ground, and as-built drawings that use the same references.

AGL cables of the same type often run side by side in one handhole or duct, so without identification the wrong cable can be cut, tested or worked on live. A tag is not proof of isolation: confirm the cable against the drawing, then isolate, lock out and prove the circuit dead under your site’s permit-to-work procedure before touching it. Update the record whenever a repair joint or re-route changes the cable.

  1. Name it. Take each cable and circuit reference from the design.
  2. Tag the ends. Fit a durable tag at each termination.
  3. Tag the route. Tag at each joint and where the cable enters every handhole or pit.
  4. Mark the ground. Fit route markers as the design requires.
  5. Record it. Show the same references on the as-built drawings.
  6. Verify before work. Match tag to drawing, then isolate and prove dead.
Tag at Terminations, joints and every handhole or pit entered
Tag shows The circuit or cable reference used on the drawings
Above ground Route markers where the design requires them
Tag durability Legible for the life of the installation
Recorded on As-built drawings, kept up to date after repairs
Reference FAA AC 150/5340-30 · ICAO Doc 9157 Pt 5 · project specification
Schematic — simplified and not to scale. Reference format, tag type and marker spacing depend on the project specification and the applicable standard; follow the design drawings, your site’s isolation and permit-to-work procedure and the manufacturer’s instructions.
Entry 28 · Cable protection Entry 30 · Cable installation

Frequently Asked Questions

Q1What is cable identification in airfield ground lighting?

Cable identification is how each AGL cable is made recognisable: a durable tag carrying the circuit identity at its ends, at joints and where it passes through handholes, route markers above ground, and as-built drawings that use the same names.

Q2Why must AGL cables be identified?

Cables of the same type often run side by side in one handhole or duct. Without identification, the wrong cable can be cut, spliced, tested or even worked on while live. Clear identity is what lets maintenance isolate and prove dead the circuit they actually intend to.

Q3Where should AGL cable tags be fitted?

At each termination, at each joint, and at every handhole, manhole or pit the cable enters, so it can be recognised wherever it is opened up. Exact positions follow the project specification.

Q4What should a cable tag show?

The circuit or cable reference used on the design and as-built drawings, so the tag, the drawing and the control system all name the circuit the same way. The tag must be durable enough to stay legible for the life of the installation.

Q5Does a cable tag prove the cable is dead?

No. A tag tells you which cable you believe you have. Before work, the circuit must still be isolated, locked out and proved dead under your site's permit-to-work procedure, and the cable confirmed against the drawing.

Q6How is cable identification recorded?

On the as-built drawings, with cable references, routes, handholes and joints marked consistently. Any change made later, such as a repair joint or re-route, is added so the record stays true.

Precision AGL Academy

See It. Understand It. Then Learn How to Engineer It.

Recognising an AGL system visually is the first step. The next step is knowing how to design, install, test, commission and maintain them correctly.

Build Practical AGL Engineering Skills

Go deeper with structured training from Precision AGL Academy, covering:

AGL Fundamentals Design & Electrical Engineering Approach Lighting Photometry Installation & Commissioning Maintenance & Troubleshooting

Learn how each light, sign and circuit works as part of a complete airport lighting system, not just as an isolated diagram.

See. Understand. Apply. Engineer.